12.03.2015 Views

ANNUAL REPORT - The Petroleum Institute

ANNUAL REPORT - The Petroleum Institute

ANNUAL REPORT - The Petroleum Institute

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>The</strong> <strong>Petroleum</strong> <strong>Institute</strong> | Annual Report - Academic Year 2011 - 2012<br />

III. Strategic Research <strong>The</strong>mes<br />

<strong>The</strong>re are four strategic research themes and<br />

focus areas. <strong>The</strong>se are addressed by professors<br />

who take the lead in developing their respective<br />

themes. Two GRC chair professors have been<br />

appointed: Dr. Jorge Salgado Gomes (Partex)<br />

and Dr. Yves Gunaltun (Total). <strong>The</strong> following<br />

research themes have been identified:<br />

• Gas processing and gas treatment<br />

• Materials science and corrosion<br />

• Advanced dynamic process simulation &<br />

control<br />

• Energy efficiency and environmental<br />

technology<br />

Application for projects<br />

In principle, new proposals can be submitted<br />

to the GRC twice a year. <strong>The</strong> approval process<br />

comprises of three steps:<br />

• <strong>The</strong> GRC Technical Committee considers/<br />

evaluates each project on its scientific<br />

merit and relevance for GASCO.<br />

• In case of a positive recommendation by<br />

the Technical Committee, the budget of<br />

the proposal will be evaluated by the GRC<br />

Finance Committee.<br />

• Final approval of the proposal belongs<br />

to the authority of the GRC Steering<br />

Committee.<br />

Monitoring progress of the projects<br />

<strong>The</strong> GRC requires quarterly reports from<br />

each project in order to monitor its progress.<br />

<strong>The</strong>se reports will be evaluated by a<br />

Project Management Committee, which has<br />

representatives from ADNOC, GASCO, Shell,<br />

Total, Partex and the PI. <strong>The</strong> GRC director<br />

chairs the committee and conclusions and<br />

recommendations will be reported to the GRC<br />

Steering Committee.<br />

Overview of approved projects<br />

At the moment (December 2012) kUSD 17,400<br />

has been assigned to 10 GRC research projects.<br />

An overview of these projects is given below:<br />

1. GR001: “Advanced Chemistry & Materials<br />

Laboratory”, Principal Investigator Dr. Yves<br />

Gunaltun; total budget: kUSD 4,200.<br />

2. GR002: “Black Powder, Sources, Detection<br />

and Mitigation in Gas Transmission and<br />

Distribution Systems”, Principal Investigator<br />

Dr. Mohamed Saeed AlShehhi; total budget:<br />

kUSD 4,100.<br />

3. GR003: “BTX removal in the sulfur recovery<br />

process using adsorption”, Principal<br />

Investigator Dr. Ahmed Al Shoaibi; total<br />

budget: kUSD 1,500.<br />

4. GR004: “CUI Monitoring Tool”, Principal<br />

Investigator Dr. Yves Gunaltun; total budget:<br />

kUSD 1,400.<br />

5. GR005: “Surface-Engineered Self-Healing<br />

Anti-Corrosion Particle Coatings for Pipes<br />

and Storage Tanks”, Principal Investigator<br />

Dr. Vikas Mittal; total budget: kUSD 700.<br />

6. GR006: “Deterioration of solvent Quality<br />

and Foaming problems in a Gas Sweetening<br />

Unit“, Principal Investigator Dr. Fawzi Banat;<br />

total budget: kUSD 1,200.<br />

7. GR007: “Corrosion Modeling for Best<br />

& Worst Case Contaminants”, Principal<br />

Investigator Dr. Yves Gunaltun; total budget:<br />

kUSD 600.<br />

8. GR008: “Proposed Solutions for the new<br />

challenges GASCO is facing in existing<br />

and new Gas plants: High H2S and<br />

CO2, and unconventional contaminants<br />

concentrations”, Principal Investigator Dr.<br />

Abdallah Berrouk; total budget: kUSD 700.<br />

9. GR009: “Ionic Liquids for CO2 Separation”,<br />

Principal Investigator Dr. Abdallah Berrouk;<br />

total budget: kUSD 2,000.<br />

10. GR010: “N2 removal from Natural Gas”,<br />

Principal Investigator Dr. Kean Wang; total<br />

budget: kUSD 1,000.<br />

32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!