Section 01600<br />

Page 4<br />

We have reviewed the proposed substitution and note the following:<br />

1. Dimensions ( will / will not ) be affected (as shown on the attached drawings).<br />

2. The manufacturer's warranty for the proposed substitution ( is the same as / differs from) the specified<br />

product (as described in the attached literature).<br />

3. The Contract Time will be ( unchanged / increased by days / decreased by days) if the<br />

substitution is accepted ( by ).<br />

4. Other trades ( will / will not ) be affected (as indicated in the attached information).<br />

5. Maintenance, service and spare parts for the proposed substitution are available from:<br />

a.<br />

b.<br />

6. If the proposed substitution is accepted, we will execute a Change Order ( increasing / decreasing) the<br />

Contract Sum by : dollars ($ ) not<br />

including charges or credits for Contractor's Overhead and Profit identified in the Owner-Contractor<br />

Agreement.<br />

By this submission we certify that:<br />

1. We have reviewed, and agree to, the provisions of section 01600 of the specifications.<br />

2. The proposed substitution has been fully reviewed and determined to be equal or superior to the product<br />

specified.<br />

3. The cost data stated above is complete. Claims for additional costs related to the substitution which may<br />

subsequently become apparent will be waived.<br />

4. Dimensions and clearances for all affected work will not change other than as noted above.<br />

5. Coordination, installation, and changes in the work as necessary for accepted substitution will be complete<br />

in all respects.<br />

6. If the product is accepted for substitution and installed, the Contractor hereby agrees that should the<br />

product fail within one year of Owner's occupancy of the building, the substituted product will be removed<br />

and replaced with the product originally specified, at no cost to the owner.<br />

Signature:<br />

Contractor's Name, Address and Phone:<br />

ARCHITECT'S REVIEW AND ACTION<br />

Substitution approved - Make submittals in accordance with Section 01340<br />

Substitution approved as noted- Make submittals in accordance with Section 01340<br />

Substitution rejected - Use specified materials<br />

Substitution Request received too late - Use specified materials<br />

Substitution Request incomplete - Resubmit with all requested information.<br />

Signed by:<br />

Date:<br />

END OF SUBSTITUTION REQUEST FORM<br />