PART 1 - GENERAL<br />

SECTION 01410<br />

TESTING LABORATORY SERVICES<br />

1.01 SCOPE<br />

A. Related Requirements Specified Elsewhere:<br />

1. Refer to paragraphs 2.2.13, 4.3.3 and 7.7 of the General Conditions.<br />

2. In the event of conflict between requirements of the General Conditions and this Section concerning<br />

testing laboratory services, for the specific items of construction listed in Section 01410, the requirements<br />

of Section 01410 shall govern.<br />

1.02 DESCRIPTION<br />

A. An Independent Testing Laboratory, employed and paid for by the Contractor, shall perform the specified<br />

testing and laboratory services.<br />

B. Materials and workmanship not meeting the required standards or performance obligations are to be removed<br />

and replaced at the Contractor's expense, including all subsequent testing.<br />

C. Where the terms "Inspector" and "Testing Laboratory" are used, they mean and refer respectively to an<br />

officially designated and accredited inspector of the testing laboratory and the testing laboratory engaged by<br />

the Contractor.<br />

1.03 WORK INCLUDED<br />

A. Inspection and testing of soil compaction and soil density.<br />

B. Inspection and testing of concrete work including design mixes, placement and reinforcing steel.<br />

C. Inspection and testing of mortar, grout and concrete masonry units, including design mixes and placement of<br />

reinforcing.<br />

D. Inspection and testing of structural steel.<br />

E. Keeping inspection and test logs of all inspections and tests.<br />

F. Submitting to Architect, Engineer, Contractor, and Owner certifications, records and reports of all inspections<br />

and tests.<br />

1.04 SUBMITTALS (CERTIFICATION)<br />

A. Submit one copy each to Architect, Consulting Engineer, Contractor, Tenant and Owner of certification of each<br />

inspection and test required.<br />

B. In each certificate state details of each inspection and test to indicate satisfactory compliance with requirements<br />

of the specifications and/or drawings or unsatisfactory conditions or failure to comply with requirements.<br />

1.05 RESPONSIBILITIES OF CONTRACTOR REGARDING TESTING LABORATORY<br />

A. Selection of the laboratory in no way relieves the Contractor of his responsibility to furnish materials and<br />

construction in full compliance with the Contract Documents.<br />

B. Notify the laboratory of material sources and furnish without cost, necessary quantities of representative<br />

samples to laboratory of materials proposed for use which are required to be tested.<br />

C. Give timely notice to the laboratory when the various construction operations requiring testing or inspection<br />

are to be performed.<br />

D. Advise laboratory to complete any required check-tests and assign personnel for field inspection and testing as<br />

specified.<br />

E. Provide adequate facilities for safe storage of test samples on project site.<br />

F. Furnish such nominal labor as is required to assist laboratory personnel in obtaining and handling samples at<br />

site.<br />

1.06 AUTHORITY AND DUTIES OF LABORATORY PERSONNEL<br />

A. Laboratory personnel shall inspect and/or test materials, assemblies, specimens, and work performed including<br />

design mixes, methods and techniques as specified and report results to Architect, Structural Engineer, Owner<br />

and Contractor.<br />

B. Should it appear that the material furnished or work performed fails to meet requirements of Contract<br />

Documents, laboratory shall direct the attention of the Contractor and the Owner's Representative to such<br />

failure or infringement.<br />

NAPA CENTURY CENTER XD 12<br />

#165582

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!