C. Review of separate item does not constitute review of an assembly.<br />

D. Affix stamp and initials or signature certifying to review of submittal.<br />

E. Return submittals to Contractor for distribution.<br />

Section 01340<br />

Page 3<br />

1.08 REQUIRED SUBMITTALS<br />

A. Shop Drawings to be returned within 90 days from Contract Award. (also refer to specification section for<br />

submittal requirements). Provide submittals applicable to commissioned systems with Ownder’s<br />

Commissioning Agent.<br />

1. LEED Checklist<br />

2. Construction Waste Management<br />

3. Indoor Air Quality Management<br />

4. General Commissioning Requirements<br />

5. Building Envelope Commissioning<br />

6. Irrigation<br />

7. Planting<br />

8. Earthwork<br />

9. Termite Control<br />

10. Concrete Foundation and Reinforcement<br />

11. Concrete Wall Panels<br />

12. Mortar and Grout<br />

13. Concrete Masonry Units<br />

14. Structural Steel<br />

15. Steel Joists and Joist Girders<br />

16. Metal Decking<br />

17. Metal Fabrications<br />

18. Steel Stairs & Railing<br />

19. Miscellaneous Metals<br />

20. Pre-finished Steel Railings<br />

21. Expansion Joint Cover Assemblies<br />

22. Rough Carpentry<br />

23. Finish Carpentry & Millwork<br />

24. Membrane Waterproofing<br />

25. Building Insulation<br />

26. Exterior Insulation and Finish System<br />

27. Roofing Membrane and Accessories – (also see section for FM Global review requirements)<br />

28. Composite Metal Building Panels<br />

29. Preformed Metal Siding<br />

30. Sheet Metal Flashing and Trim<br />

31. Metal Roof Panels<br />

32. Metal Fabrications<br />

33. Sealants and Caulking<br />

34. Metal Doors and Frames<br />

35. Plastic Faced and Flush Wood Doors<br />

36. Aluminum Entrances and Storefronts<br />

37. Finish Hardware and Hardware Schedule - NO SUBSTITUTIONS<br />

38. Glass and Glazing<br />

39. Glazed Aluminum Curtainwall<br />

40. Lath and Portland Cement Plaster<br />

41. Ceramic Tile - NO SUBSTITUTIONS<br />

42. Acoustical Ceiling - NO SUBSTITUTIONS<br />

43. Vinyl Wallcovering - NO SUBSTITUTIONS<br />

44. Wall Carpets - NO SUBSTITUTIONS<br />

45. Prefinished Panels<br />

46. Resilient Flooring & Base - NO SUBSTITUTIONS<br />

47. Carpet – (By CUSA)<br />

48. Carpet Tile – (By CUSA)<br />

49. Special Coatings<br />

NAPA CENTURY CENTER XD 12<br />