Section 01340<br />

Page 2<br />

F. Notify Architect, in writing at time of submission, of deviations in submittals from requirements of Contract<br />

Documents.<br />

G. Begin no work which requires submittals until return of submittals with Architect stamp and initials or<br />

signature indicating review.<br />

H. After Architect's review, distribute copies.<br />

1.06 SUBMISSION REQUIREMENTS<br />

A. Schedule Submission at least 14 days before dates reviewed submittals will be needed. All submittals must be<br />

into the Architect's office within 90-days of Contract award. All finish items are to be submitted in a<br />

box at the same time within 60-days of Contract award.<br />

B. Submit number of copies of Shop Drawings, and Product Data which Contractor requires for distribution.<br />

C. Submit number of Samples specified in each specification section. If Contractor wants a sample(s) for the job<br />

trailer, then enough samples should be submitted so they can be returned to the trailer.<br />

D. Accompany submittals with transmittal letter containing:<br />

1. Date<br />

2. Project title and number<br />

3. Contractor's name and address<br />

4. The number of each Shop Drawing, Product Data and Sample submitted.<br />

5. Notification of deviations from Contract Documents.<br />

6. Document recycled content on Recycled Content Information Form in Appendix A of this Section, or<br />

similar form as approved by Owner. Include pre- and post-consumer recycled content.<br />

7. Document raw material acquisition and manufacture location on Regional Material Information Form in<br />

Appendix B of this Section.<br />

8. Document VOC emissions in grams/liter (g/L) on form in Appendix C of this Section, or similar form as<br />

approved by Owner.<br />

9. Document FSC Chain of Custody information in Appendix D of this Section, or similar form as approved<br />

by Owner.Other pertinent data.<br />

E. Submittals shall include:<br />

1. Date and revision dates.<br />

2. Project title and number.<br />

3. The names of:<br />

a. Architect<br />

b. Contractor<br />

c. Subcontractor<br />

d. Supplier<br />

e. Manufacturer<br />

f. Separate detailer; when pertinent<br />

4. Identification of product or material.<br />

5. Identification of product material cost without labor.<br />

6. Product environmental data<br />

a. Pre-consumer and post-consumer ecycled content<br />

b. Location of raw material extraction, collection or harvest and distance from project.<br />

c. Location of material manufacture and distance from project.<br />

d. Chain of custody information for FSC Certified Wood Products.<br />

e. Invoices for all wood products.<br />

f. VOC levels for all interior adhesives, sealants, paints and coatings in grams/liter (g/L).<br />

7. Field dimensions, clearly identified as such.<br />

8. Specification section and number.<br />

9. Identification of deviations from Contract Documents.<br />

10. Contractor's stamp, initialed or signed, certifying to review of submittal, verification of field measurements<br />

and compliance with Contract Documents.<br />

1.07 ARCHITECT'S DUTIES<br />

A. Review submittals with reasonable promptness.<br />

B. Review for:<br />

1. Design concept of project.<br />

2. Information given in Contract Documents.<br />

NAPA CENTURY CENTER XD 12<br />