PART 1 - GENERAL<br />

1.01 GENERAL<br />

A. Designate in Construction Schedule delivery rates for products under each allowance.<br />

B. Designate in Schedule of Values quantities of materials specified under unit cost allowances.<br />

SECTION 01020<br />

ALLOWANCES<br />

1.02 ALLOWANCES FOR PRODUCTS<br />

A. Purchase products under each allowance as directed by Architect.<br />

B. Include following amount in Bid, for inclusion in Contract Sum only for those materials not specified on<br />

the drawings:<br />

C. Amount of each allowance includes the following, unless otherwise indicated above:<br />

1. Net cost of product.<br />

2. Delivery and unloading at site.<br />

3. Applicable taxes.<br />

D. In addition to amounts of allowances, include in Proposal, for inclusion in Contract Sum, Contractor's costs<br />

for:<br />

1. Handling at site, including crating and storage.<br />

2. Protection from elements, from damage.<br />

3. Labor, installation, and finishing.<br />

4. Other expenses required to complete installation.<br />

5. Overhead and profit.<br />

1.03 SELECTION OF PRODUCTS<br />

A. Architect's duties:<br />

1. Consult with Contractor in consideration of products and suppliers.<br />

2. Make selection, designate products to be used.<br />

3. Notify Contractor, in writing, designating:<br />

a. Product, model and finish.<br />

b. Accessories and attachments.<br />

c. Cost, delivered at site.<br />

B. Contractor's Duties:<br />

1. Assist Architect in determining qualified suppliers.<br />

2. Obtain proposals from suppliers when requested by Architect.<br />

3. Make appropriate recommendations for consideration of Architect.<br />

4. Notify Architect of any effect anticipated by selection of product or supplier under consideration on:<br />

a. Construction Schedule<br />

Contract Sum<br />

5. On notification of selection, enter into purchase agreement with designated suppliers.<br />

1.04 DELIVERY<br />

A. Contractor's Responsibility:<br />

1. Arrange for delivery and unloading.<br />

2. Promptly inspect products for damage or defects.<br />

3. Submit claims for transportation damage.<br />