Geotechnical Investigation South River Place, Gasser Drive, Napa 29 December 2010<br />

________________________________________________________________________________________________________<br />

groundwater and/or localized seepage zones. The mass grading and underground contractor<br />

should be made aware of these conditions so that appropriate dewatering methods can be<br />

employed.<br />

Grading<br />

It is recommended that grading for the proposed site be performed during the drier seasons to<br />

minimize potential compaction problems resulting from excessive moisture, perched water and<br />

ground seepage. Should grading be performed during the wetter months, delays may occur due to<br />

extensive processing and/or chemical modification (lime/cement treatment) may be required. The<br />

grading recommendations presented herein should be followed during the mass grading operations<br />

on the subject site.<br />

We anticipate that the proposed grading will consist of cuts and fills up to 7 vertical feet to achieve<br />

the design building pad and pavement subgrade elevations. However, as noted above, there will<br />

still be stockpile soils left at these grades and the soils will be non-uniform. In addition, the existing<br />

near surface materials consists of firm sandy clays and loose sands which require densification prior<br />

to foundation construction. The densification can be achieved through conventional grading<br />

techniques or by in-place methods such as stone columns or compaction grouting.<br />

The following recommendations are applicable to densification by conventional grading techniques.<br />

In areas where buildings are proposed and where Hartle Court will be widened, the old fill soils<br />

identified in the borings should be over-excavated to undisturbed native ground as observed and<br />

approved by the Soil Engineer. Based on the borings, excavations to elevations ranging from +1<br />

to +5 feet should be expected resulting in over-excavation depths of 5 to 11 feet (not including<br />

the stockpile). Localized dewatering of the excavations may be required by the contractor,<br />

especially near Borings 2 and 3. The excavation should extend a minimum of 5 feet laterally<br />

beyond the building footprint and the area replaced with engineered fill as noted below. We also<br />

note that debris may be encountered in the excavated fill that must be removed from the site.<br />

While we did not encounter any during this investigation, our experience on adjacent projects<br />

indicates there is a possibility of this condition.<br />

Based on our experience on the adjacent construction operations for Hartle Court, Transitional<br />

Housing, Homeless Shelter and Fire Station, the native clay soils that will be exposed will likely<br />

be soft, wet and unstable. Placement of fill on these materials with conventional earthmoving<br />

equipment will likely be difficult. Therefore, as we have performed on the adjacent sites, a<br />

stabilization layer should be anticipated by the contractor at the bottom of the excavations. The<br />

stabilization layer should consist of Tensar BX1200 (or approved equivalent) geogrid overlain by<br />

________________________________________________________________________________________________________<br />

KC ENGINEERING COMPANY Project No. VV3200 Page 16 of 123