Geotechnical Investigation South River Place, Gasser Drive, Napa 29 December 2010<br />

________________________________________________________________________________________________________<br />

the animal shelter. Once this is complete, Hartle Court (old) will be abandoned. In addition to the<br />

road improvements through the site, there are several underground utilities along the road alignment<br />

and also along the western property boundary.<br />

With the exception of a stockpile noted below, the topography of the site is relatively flat to gently<br />

sloping with localized elevation differentials as shown on Figure 4, Site Plan. It is our<br />

understanding that the site was filled over the years since the early 1950’s with dredge materials<br />

from the nearby Napa River. The site is currently vacant (except for the street and utility<br />

improvements noted above) and appears to have never been developed. However, it is noted that<br />

subsequent to our original investigation in 2002, a soil stockpile was placed on the site between the<br />

two Hartle Courts. The stockpile materials were imported from the Imola Street Bridge<br />

embankment material. The stockpile has recently been added to with excess materials from the<br />

transitional housing project. The stockpile is approximately 465 feet long, 215 feet wide and up to<br />

15 feet high as shown on Figure 4. Based on testing performed by our firm, the soil materials<br />

consist of brown to dark brown, moderately expansive sandy clay 1 . The soil materials were<br />

determined to be acceptable for use as general fill on the Gasser site, but not under proposed<br />

building foundations where conventional footings are used. The materials were also determined to<br />

be environmentally acceptable for use on the site. A smaller pile of soil and debris is located<br />

adjacent to the ponds. Vegetation on the site consists of volunteer grasses and weeds with a few<br />

trees around the ponds.<br />

The above description is based on a reconnaissance of the site by a Geotechnical Engineer, on a<br />

Scheme 17 Site Plan by LPAS Architects dated 14 October 2010 overlaid onto topographic data<br />

from Foulk, Gomez and Associates, an aerial photo from Google Earth, and the USGS<br />

Topographic Map of the Napa Quadrangle as obtained from the 3D TopoQuads program by<br />

DeLorme. The Scheme 17 Site Plan and topographic data are the basis for our Site Plan included<br />

as Figure 4 in Appendix A.<br />

Proposed Development<br />

Based on our review of the referenced site plan, we understand that Phase I of the South River<br />

Place development includes a new Cinemark Theater building of approximately 41,700 square<br />

feet, and four additional commercial office, retail or restaurant buildings noted as Retail 1, Retail<br />

2, Pad 1 and Pad 2 ranging in size from 2,400 to 9,000 square feet. Additional improvements<br />

will consist of constructing a plaza area, driveways, landscaping, underground utilities, concrete<br />

flatwork, parking lots and widening of Hartle Court (new). In addition, an overflow parking lot<br />

will be constructed north of Hartle Court (new).<br />

1 Letter titled Import Fill Evaluation, prepared by KC Engineering Company, dated 8 March 2005.<br />

________________________________________________________________________________________________________<br />

KC ENGINEERING COMPANY Project No. VV3200 Page 6 of 123