10.03.2015 Views

specs

specs

specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Document 00800<br />

Page 15<br />

recovery from the Owner, the Contractor, its Subcontractors and Sub-subcontractors until such time as the<br />

Contractor and all Subcontractors have been paid in full.<br />

11.8 EXPANSION/RENOVATION WORK ON EXISTING STRUCTURES<br />

11.8.1 In recognition of any Work to be performed by Contractor, its Subcontractors and Sub-subcontractors within or<br />

adjacent to existing structure(s) for the purpose of renovation and/or expansion, Owner shall waive any right of<br />

subrogation and cause all existing permanent property insurance policies covering said structure(s) to be<br />

endorsed as follows:<br />

"It is understood and agreed that the policy is hereby amended to include as additional insureds Contractor, its<br />

Subcontractors and Sub-subcontractors, during the term of construction. It is further understood and agreed that<br />

this Company waives all rights it may have acquired by payment of loss hereunder against Contractor, and all<br />

tiers of Subcontractors, their agents and employees regardless of whether the damage was to work or to<br />

property damage which was not included in the work."<br />

11.8.2 This Paragraph 11.8 shall continue in full force and effect until all Work to be performed by the Contractor and<br />

all tiers of Subcontractors is determined to be one hundred (100%) complete, accepted by the property owner,<br />

and the Contractor has been paid in full for Work performed under The Construction Agreement.<br />

11.8.3 Owner’s separate or assigned contractors shall be required to provide appropriate indemnification, insurance<br />

and waivers of subrogation as may be required by Contractor.<br />

ARTICLE 12<br />

UNCOVERING AND CORRECTION OF WORK<br />

12.1.1 In the first line after the word “…Architect’s…” insert the words “…or Owner’s...” In the second line after the<br />

word “…Architect…” insert the words “…or Owner…” In the third line after the word “…Architect’s…” insert the<br />

words “…or Owner’s…”<br />

12.1.2 In the first line after the word “…Architect…” insert the words “…or Owner…” In the second line after the<br />

word “…Architect…” insert the words “…or Owner…”<br />

12.2.1 In the first line after the word “…Architect…” insert the words “…or Owner…”<br />

ARTICLE 13<br />

MISCELLANEOUS PROVISIONS<br />

Add Paragraph 13.1.2 as follows:<br />

13.1.2 During the performance of this Contract, Contractor agrees to fully comply with, observe and be bound by all<br />

applicable laws, ordinances, and regulations, including without limitation, all state and local codes and<br />

ordinances, Uniform Building Code, National Electric Code, local fire marshal, The National Fire Protection<br />

Agency Publication, and all rules and regulations of all agencies or governmental bodies having jurisdiction<br />

over the Work.<br />

13.5.2 In the fourth line after the word “…Architect…” insert the words “…and Owner…” In the fifth<br />

line after the word “…Architect…” insert the words “…and Owner…”<br />

13.5.5 In the first line after the word “…Architect…” insert the words “…or Owner…” In the second line after the<br />

word “…Architect…” insert the words “…or Owner…”<br />

Add Paragraph 13.8 as follows:<br />

NAPA CENTURY CENTER XD 12<br />

#165582

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!