procedures and other requested equipment documentation to Commissioning Agent for<br />

review.<br />

9. During the start-up and initial checkout process, execute and documents the electricalrelated<br />

portions of the pre-functional checklists provided by the Commissioning Agent for<br />

all commissioned equipment.<br />

10. Perform and clearly document all completed start-up and system operational checkout<br />

procedures, providing a copy to the Commissioning Agent.<br />

11. Address current A/E punch list and Action List items before functional testing.<br />

12. Provide skilled technicians to execute starting of equipment and to assist in the functional<br />

performance tests. Ensure that they are available and present during the agreed-upon<br />

schedules and for sufficient duration to complete the necessary tests, adjustments and<br />

problem solving.<br />

13. Correct deficiencies (differences between specified and observed performance) as<br />

interpreted by the Commissioning Agent and A/E and retest the equipment.<br />

14. Prepare O&M manuals according to the Contract Documents, including clarifying and<br />

updating the original sequences of operation to as-built conditions.<br />

15. During construction, maintain as-built red-line drawings for all drawings and final CAD asbuilts<br />

for contractor-generated coordination drawings. Update after completion of<br />

commissioning.<br />

16. Provide training of the Owner’s operating personnel as specified.<br />

17. Coordinate with equipment manufacturers to determine specific requirements to maintain<br />

the validity of the warranty.<br />

Warranty Period<br />

1. Correct deficiencies and make necessary adjustments to O&M manuals and as-built<br />

drawings for applicable issues identified in any seasonal testing.<br />

1.03 RELATED WORK<br />

A. Refer to Division 1, Part 1 for a listing of all sections where commissioning requirements are found.<br />

B. Refer to Division 1, Part 1 for systems to be commissioned and for functional testing requirements.<br />

1.04 COMMISSIONED SYSTEMS<br />

A. Refer to Commissioning Agent Plan. There are no specific systems which fall under electrical<br />

systems that are to be commissioned on this project, under LEED NC 2009, Functional<br />

Commissioning, but the electrical contractor is to be part of the Commissioning Agent team and is to<br />

assist the mechanical contractor in the total Commissioning Agent process.<br />

PART 2 – PRODUCTS<br />

2.01 TEST EQUIPMENT<br />

A. Division 16 shall provide all test equipment necessary to fulfill the testing requirements of this Division.<br />

PART 3 – EXECUTION<br />

3.01 SUBMITTALS<br />

A. Division 16 shall provide submittal documentation relative to commissioning as required in this<br />

Section Part 1, Division 1.<br />

B. The Commissioning Agent shall review all submittals.<br />

3.02 START-UP PRE-FUNCTIONAL CHECKLISTS AND INITIAL CHECKOUT<br />

A. The electrical contractors shall follow the start-up and initial checkout procedures listed in the<br />

Responsibilities list in this section and in Division 1. Divisions 15 and 16 has start-up responsibility<br />

and is required to complete systems and sub-systems so they are fully functional, meeting the design<br />

objectives of the Contract Documents. The commissioning procedures and functional testing do not<br />

relieve or lessen this responsibility or shift that responsibility partially to the Commissioning Agent or<br />

Owner.<br />

END OF SECTIOIN 16995<br />

Cinemark 16995 - 2 Electrical Systems Commissioning<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!