SECTION 16900<br />

AUTOMATIC TEMPERATURE CONTROLS SYSTEMS (ATCS)<br />

PART 1 - GENERAL<br />

1.01 RELATED DOCUMENTS<br />

A. The general provisions of the Contract, including General Conditions, apply to the work specified in<br />

this Section.<br />

1.02 RELATED WORK SPECIFIED ELSEWHERE<br />

A. All other Sections of Division 16.<br />

B. All other Divisions of the Contract Documents. Refer to each Division's specifications and drawings<br />

for all requirements.<br />

C. Section 15500.<br />

1.03 SCOPE<br />

A. The automatic temperature control system (ATCS) shall be furnished and installed as indicated on the<br />

drawings.<br />

B. The control components will be as hereinafter specified and scheduled.<br />

C. Any additional parts necessary to or incidental for a complete and operating system shall be the<br />

responsibility of the ATCS contractor.<br />

D. All air conditioning unit controls (except as noted), wiring and wiring terminations will be furnished and<br />

installed as shown on the drawings.<br />

E. The control devices internal to the rooftop unit will be installed by the ATCS vendor.<br />

F. Labor warranty for the temperature controls and wiring is to be furnished by the electrical Contractor<br />

for a period of one year.<br />

G. The ATCS vendor shall provide the following minimum services (see sheet MEP0.2 for additional<br />

information):<br />

1. The engineering, calibration, and software programming of the ATCS.<br />

2. The calibration and adjustment of all thermostats (and sensors), CO2 sensors, variable<br />

speed controllers (as applicable) and all other controlling devices.<br />

3. The low voltage ATCS wiring terminations.<br />

4. Place the control systems in satisfactory operating condition.<br />

5. Instruct the assigned operating personnel in the operation and maintenance of these<br />

controls. At the completion of the project, the ATCS control vender shall schedule and<br />

provide a 2 hour instruction period with the theatre manager and assistant manager.<br />

6. Furnish diagrammatic layouts of automatic control systems and a set of printed instructions to<br />

the Owner, for both operation and maintenance.<br />

7. Provide a set of AS-Built control diagrams at the completion of the project clearly showing<br />

any field changes to the original layout.<br />

I. All motorized dampers not integral with the rooftop units shall be furnished and installed as<br />

indicated on the Matrix of Responsibility.<br />

J. For the D/X split systems, the electrical contractor shall furnish and install the low voltage control<br />

wiring in accordance with the mechanical contractor’s requirements. The mechanical contractor shall<br />

furnish a compatible thermostat.<br />

K. The electrical contractor shall furnish and install all 120V wiring for the ATCS (allow a minimum of<br />

three circuits at three different locations).<br />

L. The electrical contractor shall furnish and install all conduits with pull strings.<br />

M. The ATCS vender shall furnish and install normally closed contactors in an enclosure for the control of<br />

Cinemark<br />

16900 - 1 Automatic Temperature Controls Systems (ATCS)<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!