a. Provide all metering equipment as required and shown on the drawings.<br />

b. Meter Location: As indicated on the drawings and per the owner's direction.<br />

5. Transformer Pad:<br />

a. Provided by contractor in accordance with the power company's requirements.<br />

b. Refer to the architectural site plan for the exact location.<br />

3.08 INSPECTION OF SITE<br />

A. Site Visit<br />

1. Before submitting a bid, all bidders shall carefully examine the drawings and specifications,<br />

and visit the site.<br />

2. Bidders shall fully inform themselves in detail as to all existing conditions, limitations,<br />

available clearances; shall thoroughly check all obstructions which are to be removed or<br />

relocated to permit installation of the new equipment and facilities; and shall include in their<br />

proposals a sum to cover the cost of all contingencies and work as required under the<br />

drawings and specifications included in the Contract.<br />

B. Failure on the part of any bidder and/or Contractor to familiarize himself with all existing conditions as<br />

may be encountered or enumerated above will not be considered sufficient justification to request or<br />

obtain any extra compensation over and above the Contract Price.<br />

3.09 PROTECTION OF EQUIPMENT<br />

A. Do not deliver equipment to jobsite until progress of construction has reached the state where<br />

equipment is actually needed, or until building is closed in enough to protect equipment from the<br />

weather. Equipment allowed to stand in weather will be rejected, and Contractor is obligated to<br />

furnish new equipment of a like kind.<br />

B. Adequately protect equipment (including all Owner-furnished items) from damage after delivery to job.<br />

Cover with heavy cloth or other suitable material as required to protect from damage.<br />

C. Equipment which has been marred, bent, etc., by construction activities will be rejected. Replace with<br />

new equipment as specified.<br />

3.10 RECORD DRAWINGS<br />

A. Obtain, at Contractor's expense, a set of white prints and keep these on jobsite during construction.<br />

During course of construction, mark on these prints any changes which are made, noting particularly<br />

locations of those items which will need to be located for servicing.<br />

B. At completion of job, obtain (at Contractor's expense) a set of "washoff" erasable mylar sepias and<br />

incorporate all changes noted on the work prints. This must be done by a skilled draftsman. Mark<br />

each sheet "Record Drawings", with date, and deliver to Architect.<br />

3.11 FINAL TESTS<br />

A. Upon completion of the work, test the individual systems, including all feeders, branches, outlets,<br />

lighting, motors, apparatus, and appliances.<br />

B. Provide all instruments, labor and materials required by Architect for any essential intermediate and<br />

final tests.<br />

C. Tests shall indicate full compliance with specifications, drawings and applicable codes.<br />

D. The contractor shall assist and coordinate pre-function checklist, startup and system<br />

functional testing with Commissioning Agent. Coordinate retesting as necessary<br />

until satisfactory performance is verified.<br />

3.12 INSPECTION<br />

A. Entire installation subject to Engineer's inspection, final approval and acceptance.<br />

B. Any corrections to the installed work shall be at the Contractor's expense.<br />

END OF SECTION<br />

Cinemark 16000 - 10 General Conditions for Electrical Work<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11