fixtures and bear cost of redoing work or other trades necessitated by failure to comply with this<br />

requirement.<br />

C. CEILING GRID<br />

1. All light fixtures, vents, etc., shall be located to conform to the ceiling grid system.<br />

2. Examine all drawings to become familiar with this requirement.<br />

D. In certain instances, the Architect may require relocation of receptacles, switches, light fixtures or<br />

other electrical devices, equipment and switches, etc. Where relocation is within ten feet of<br />

location shown on drawings, and when Contractor is informed of necessary relocation before<br />

work is begun on this portion of the job, the relocation will be at Contractors' expense.<br />

E. The drawings are schematic in nature and are not intended to show exact locations of conduit, but<br />

rather to indicate distribution, circuitry, and control.<br />

F. Where there is an apparent discrepancy between the architect’s drawings and the electrical drawings,<br />

such discrepancy shall be called to the attention of the engineer through the form of an Request for<br />

Information. In general, the engineer’s drawings shall take precedence over the architectural<br />

drawings.<br />

1.17 DEVIATIONS<br />

A. No deviations from plans and specifications made without knowledge and approval of Architect.<br />

1.18 DEFINITIONS<br />

A. Provide: As used herein shall mean "furnish, install and connect complete unless otherwise noted."<br />

B. Wiring: As used herein shall mean "wire and cable, installed in raceway within all required boxes,<br />

fittings, connectors, and accessories; completely installed".<br />

C. Work: As used herein shall be understood to mean the materials completely installed, including the<br />

labor involved.<br />

D. Review of Shop Drawings; As used herein shall be understood to be a service by the Architect to<br />

reduce the possibility of materials being ordered which do not comply with the Contract Documents.<br />

See also Paragraph 4.2.7 and Article 3.12 of the General Conditions.<br />

E. ADA: American Disabilities Act.<br />

PART 2 - PRODUCTS<br />

2.01 STANDARD PRODUCTS<br />

A. Each item of equipment furnished under this specification shall be essentially the standard product of<br />

the manufacturer. Where two or more units of the same kind or type of equipment are required, these<br />

shall be the products of a single manufacturer. All equipment shall be U.L. and NEMA approved and<br />

shall be made in the U.S.A.<br />

B. All material and equipment shall be new, and of the best quality used in good commercial practice<br />

and shall be the product of a reputable manufacturer. Each major component shall bear a name plate<br />

giving the name and address of the manufacturer and the catalogue number of designation.<br />

C. Major distribution equipment, such as panelboards, distribution switchboards, motor control centers,<br />

dry type transformers, busways, fused switches/ disconnects, substations, and switchgear, shall be<br />

the same manufacturer.<br />

2.02 MANUFACTURER'S DIRECTIONS<br />

A. All manufactured articles, materials and equipment shall be applied, installed, connected, erected,<br />

used, cleaned and conditioned as directed by the manufacturers, unless herein specified to the<br />

contrary.<br />

2.03 EQUIPMENT INSTALLATION<br />

Cinemark 16000 - 6 General Conditions for Electrical Work<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!