contractual or agreed upon rates. All Change Order work shall be executed on a straight time basis<br />

(as opposed to overtime or premium time) unless specifically authorized in writing prior to the start of<br />

the work.<br />

H. Should any of these errors, omissions, conflicts, or ambiguities exist, the Contractor shall have them<br />

explained and adjusted in writing before signing the Contract or proceeding with the work; otherwise,<br />

he shall, at his own expense, supply the proper materials and labor to make good any damage or<br />

defects in his work or the results obtained therefrom, caused by such discrepancy.<br />

I. Wherever conflicts occur between different parts of the Contract Documents, the greater quantity, the<br />

better quality, or larger size shall prevail unless the Architect informs the Contractor otherwise in<br />

writing.<br />

J. When drawing revisions are issued, a written description of the changes will be issued with the<br />

revisions. The contractor is to provide pricing on a line item basis (with backup) to match the<br />

description of the written changes.<br />

1.03 EXAMINATION OF THE SITE<br />

A. The Contractor shall examine the site and all conditions thereon and/or therein, prior to submitting bid.<br />

All conditions shall be taken into consideration as they may affect the work. The Contractor shall be<br />

satisfied as to the existing grades and the actual formation and soil condition. The lack of specific<br />

information on the drawings shall not relieve the Contractor of the responsibility of taking into account<br />

all site conditions before bidding. No extras will be allowed for work resulting from conditions<br />

that would have been evident upon a thorough examination of the site. Notify the engineer<br />

prior to bid closing date of any discrepancies or points of doubt or contention. Failing this<br />

action, include in the bid for the most expensive course of action.<br />

1.04 PERMITS AND FEES<br />

A. All necessary permits, licenses, and fees required to carry out the work shall be procured by the<br />

Contractor. Also, all necessary certificates of approval which must be delivered to the Architect<br />

before final acceptance of the work shall be obtained by the Contractor at his expense.<br />

1.05 CONTRACTORS QUALIFICATIONS<br />

A. Each individual employed by the Contractor or by any Subcontractor or Contractor's Consultant shall<br />

be experienced, qualified and competent to correctly perform all work required of him on this project<br />

and to the satisfaction of the Architect.<br />

B. Technical, supervisory and administrative personnel shall have knowledge of the engineering<br />

principles involved in the design of the systems required by the Contract Documents and shall be<br />

experienced and qualified in the correct interpretation of the requirements of these Documents to the<br />

satisfaction of the Architect.<br />

C. Any firm or individual not having the necessary experience and/or qualifications shall not be used on<br />

this project.<br />

1.06 CODES AND ORDINANCES<br />

A. The Contractor is expected to know or to ascertain, in general and in detail, the requirements of all<br />

Codes and Ordinances applicable to the construction and operation of systems covered by his<br />

Contract. He shall know or ascertain the rulings and interpretations of Code requirements being<br />

made by all authorities having jurisdiction over the work to be performed by him.<br />

B. In preparing his bid, the Contractor shall include the cost of all items and procedures necessary to<br />

satisfy the requirements of all applicable Codes, Ordinances and Authorities, whether or not these are<br />

specifically covered by the drawings and specifications. All cases of serious conflict or omission<br />

between the drawings, specifications and codes shall be brought to the Architect's attention as<br />

hereinbefore specified. The Contractor shall carry out his work and complete his construction as<br />

required by applicable Codes and Ordinances and in such manner as to obtain approval of all<br />

authorities whose approval is required.<br />

C. The Contractor shall procure all necessary permits or licenses to carry out his work and pay the lawful<br />

Cinemark 16000 - 2 General Conditions for Electrical Work<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11