Temperature Controls<br />

Plumbing Reclaimed Water System<br />

PART 2 – PRODUCTS<br />

2.01 TEST EQUIPMENT<br />

A. Division 15 shall provide all test equipment necessary to fulfill the testing requirements of this Division.<br />

B. Refer to Division 1 for additional Division 15 requirements.<br />

PART 3 – EXECUTION<br />

3.01 SUBMITTALS<br />

A. Division 15 shall provide submittal documentation relative to commissioning as required in this<br />

Division 1.<br />

3.02 START-UP<br />

A. The HVAC mechanical Contractor shall follow the start-up and initial checkout procedures listed in the<br />

Responsibilities list in this Division 1. Division 15 has start-up responsibility and is required to<br />

complete systems and sub-systems so they are fully functional, meeting the design objectives of the<br />

Contract Documents. The commissioning procedures and functional testing do not relieve or lessen<br />

this responsibility or shift that responsibility partially to the Commissioning Agent or Owner.<br />

B. Function testing is intended to begin upon completion of a system. Functional testing may proceed<br />

prior to the completion of systems or sub-systems at the discretion of the Commissioning Agent and<br />

CM/GC. Beginning system testing before full completion does not relieve the Contractor from fully<br />

completing the system, including all pre-functional checklists as soon as possible.<br />

3.03 TEST AND BALANCE (TAB)<br />

A. Refer to the TAB responsibilities in Part 1 and 2 above.<br />

3.04 FUNCTIONAL PERFORMANCE TESTS<br />

A. Refer to this section and the Commissioning Agent Plan for a list of systems to be commissioned.<br />

B. The Commissioning Agent shall create the functional performance procedures and guideline after<br />

review and comment of the equipment startup documents supplied by the contractor.<br />

C. The Commissioning Agent is to witness and document the functional performance testing. All hands<br />

on testing and equipment required by the Commissioning Agent are to be supplied and performed by<br />

the contractor. The contractor’s fees are to be included in their base bid.<br />

D. If more than one return visit is required by the Commissioning Agent due to failed systems, the<br />

contractor is responsible for the Commissioning Agent team hourly rate and expenses.<br />

3.05 TESTING DOCUMENTATION, NON-CONFORMANCE AND APPROVALS<br />

A. Refer to Division 1 for issues relating to functional performance tests.<br />

3.06 SPECIAL TAB DOCUMENTATION REQUIREMENTS<br />

A. The TAB will compile and submit the following with other documentation that may be specified<br />

elsewhere in the Specifications.<br />

1. Final report containing an explanation of the methodology, assumptions, test conditions and<br />

Cinemark 15995 - 4 MECHANICAL SYSTEMS COMMISSIONING<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11