D. The Owner’s rooftop unit supplier shall provide an operational checkout of the rooftop units after<br />

the mechanical contractor has performed the required startup.<br />

2.20 AIR FILTERS<br />

A. Filters are to be MERV 13 filtration required for return and supply. Provide product data<br />

submission for filtration media.<br />

B. Install filters in all AHUs, FCU’s and RTU’s<br />

C. If the AHUs, FCU’s or RTU’s are started and operated prior to .4 weeks before opening (or<br />

substantial completion), the contractor shall protect the evaporator coils from becoming dirty or shall<br />

be back charged for cleaning the coils. The protection can include filter changes on a weekly or by<br />

weekly basis.<br />

D. There shall be a minimum total of two filter changes by the mechanical contractor: one prior to test<br />

and balance, and one on opening day. If the rooftop units or air handlers are operated during<br />

construction, the contractor is responsible for covering the return air duct openings with filter media<br />

and additional filter changes as required to keep the coils clean.<br />

2.21 GUARANTY-WARRANTY<br />

A.. The subcontractor shall furnish a written warranty, countersigned and guaranteed by the General<br />

Contractor, stating all work executed under this section shall be free from defects of materials and<br />

workmanship for a period of one year from the date of final acceptance.<br />

B. The above parties further agree that they will, at their own expense, repair and replace all such<br />

defective work, and all other work damaged thereby, which becomes defective during the term of<br />

the Guaranty-Warranty.<br />

2.22 SMACNA TABLE 1-5 2” RECTANGULAR DUCT REINFORCEMENT IS REPEATED AS FOLLOWS:<br />

Cinemark 15500 - 10 Heating, Ventilating and Air Conditioning<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11