D. Units shall contain hermetic multi-cylinder compressors, which shall have positive constant<br />

pressure lubrication. Units shall contain indoor and outdoor coils, of non-ferrous construction with<br />

aluminum plate fins mechanically bonded to seamless copper tubing with all joints brazed.<br />

E. The supply fans shall be capable of delivering required cfm of air against external static pressure<br />

scheduled. The supply fans shall be centrifugal type, belt driven by permanently lubricated<br />

motors and variable sheaves.<br />

F. Condenser fans shall be propeller type, direct driven by permanently lubricated motors.<br />

G. Refrigeration system shall be protected by high and low pressure stats, loss of charge and indoor<br />

coil freeze-up protection devices, current and temperature sensitive compressor motor protectors,<br />

and a device which prevents starting of compressor more than once every five minutes.<br />

H. Rooftop units as scheduled shall be combined heating, electric cooling units with ARI certified<br />

rating.<br />

I. Units as scheduled will have economizers, motorized outside air dampers and motorized relief<br />

dampers. The mechanical contractor shall field install the economizer hood shipped with the unit.<br />

J. Prior to final acceptance, unit manufacturer shall furnish, in triplicate, certification that rooftop<br />

units are installed and operating in accordance with plans and specifications and all safety<br />

controls are functioning satisfactorily.<br />

K. Certain units shall have a factory installed GFI weather proof convenience receptacle. The<br />

receptacle shall be powered by the electrical contractor.<br />

L. The units shall have factory installed filter racks and access doors with one set of filters installed.<br />

The filters shall 2” pleated media (refer to the filter paragraph below for specification). Refer to the<br />

schedule for additional options and accessories.<br />

M. Theatre rooftop units shall be Lennox. The outside air controller (from the CO2) shall be<br />

proportional, not stepped.<br />

2.12 EQUIPMENT ELECTRICAL REQUIREMENTS<br />

A. All equipment with integral heaters, motors and devices which require electrical voltage or phase<br />

voltage different from primary service voltage to the unit shall be internally equipped with<br />

transformers so only a single electrical service is required to the unit.<br />

B. If the electrical characteristics of the equipment actually furnished differs from that scheduled, the<br />

HVAC contractor is responsible for:<br />

1. Coordinating the changes with the electrical contractor<br />

2. The cost incurred by the electrical contractor associated with the change.<br />

3. Design costs associated with the change required for resubmission to the governing<br />

authorities.<br />

2.13 INSTRUCTION AND INSTRUCTION BOOKLETS<br />

A. Instruct Owner or representative thoroughly in proper operation of systems.<br />

B. Provide at least two copies of instruction booklets, including simple step instructions for normal<br />

operation, minor maintenance suggestions and control diagram.<br />

C. After compliance with above, secure letter from Owner acknowledging same, give letter together<br />

with two additional instruction booklets to Architect for his permanent file.<br />

2.14 TESTING AND BALANCING<br />

A. The Section 15034 Test and Balance (TAB) Contractor shall balance the entire system for proper<br />

operation. Refer to Section 15034 for additional information.<br />

B. Contractor shall provide for a second start-up of each unit at the beginning of the season opposite<br />

that in which the system is first operated and tested.<br />

D. The HVAC contractor shall make any changes or replacements to the sheaves, belts, dampers,<br />

valves, etc. required for correct balance as advised by the TAB Contractor, at no additional<br />

expense to the Owner.<br />

Cinemark 15500 - 8 Heating, Ventilating and Air Conditioning<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!