10.03.2015 Views

specs

specs

specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

sub-contract drawings.<br />

D. Coordinate work to avoid interference with other trades.<br />

E. Do not scale plans. They are diagrammatic.<br />

F. Check all dimensions at building.<br />

1.06 CUTTING AND PATCHING<br />

A. Cutting and Patching shall be the responsibility of the General Contractor. However, this<br />

Contractor is referred to the General Conditions.<br />

1.07 SHOP DRAWINGS AND SUBMITTALS<br />

A. Refer to Section 15000 for additional submittal requirements<br />

B. Sheet Metal Shop Drawings are not required. The contractor is to check all clearances prior to<br />

fabrication. The routing of the ducts, particularly in the auditorium and projection booth is to be<br />

followed.<br />

1. The Contractor is verify all structural and architectural clearances prior to fabrication of the<br />

duct work.<br />

2. The design intent must be followed, including the equal friction design of the branch ductwork<br />

in the auditoriums.<br />

3. No deviation from the auditorium or projection booth duct work is allowed except for<br />

coordination with the allowable space and only after RFI.<br />

C. Cut sheets:<br />

1. Cut sheets: Submit via email electronic cut sheets in Adobe .PDF format (one PDF file<br />

per submittal).<br />

2. Do not submit binders or notebooks.<br />

PART 2 - MATERIALS AND INSTALLATION<br />

2.01 MATERIALS AND INSTALLATION - GENERAL<br />

A. New and first grade; Refer to Article 3 of the General Conditions.<br />

B. During construction furnish and install a filter medium over all open return air ducts. Cut to size<br />

and clip on. Just prior to test and balance, remove the filter media and replace unit filters .<br />

C. The ductwork drawings represent the performance arrangement of the material to convey hot,<br />

cold, ventilation or exhaust air from one point to another point.<br />

1. The drawings of the ductwork represent the general routing intended.<br />

2. The ductwork may be shown as single line or double line. When shown as double line, it<br />

is for the purpose of conveying concept and it assists the designer in estimating pressure<br />

drop for the purpose of sizing fans and air handling equipment. The dimensions given on<br />

the single line or the double line ductwork are given for the purpose of establishing<br />

velocity, pressure drop, aspect ratio and performance standards. The ductwork size is<br />

not intended to be absolute or specific. It is intended to give the Contractor a general<br />

scope from which he can estimate quantities of sheet metal and labor for the work.<br />

3. The drawings do not and are not intended to show in detail all transitions, elbows or<br />

turns. It is to be understood that this ductwork shown occupies, along with other trades,<br />

the void spaces within the building above and below structural work. The exact routing<br />

location and position of this ductwork is the responsibility of the Contractor.<br />

4. The Contractor is not to use the drawings for direct fabrication of material.<br />

D. All exposed elements above or behind return air grilles are to be painted flat black.<br />

Cinemark 15500 - 2 Heating, Ventilating and Air Conditioning<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!