10.03.2015 Views

specs

specs

specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION 15500<br />

HEATING, VENTILATING AND AIR CONDITIONING<br />

PART 1 - GENERAL<br />

1.01 RELATED DOCUMENTS<br />

A. The general provisions of the Contract, including General and Supplementary Conditions, apply to the<br />

work specified in this Section.<br />

1.02 RELATED WORK SPECIFIED ELSEWHERE<br />

A. All other Sections of Division 15.<br />

B. All other Divisions of the Contract Documents. Refer to each Division's specifications and drawings<br />

for all requirements.<br />

C. Section 16900<br />

1.03 SCOPE<br />

A. Provide a complete heating, ventilating and air conditioning systems including all air distribution, as<br />

indicated on the drawings and in these specifications.<br />

B. Meet or exceed the minimum requirements of local heating, ventilating and air conditioning codes.<br />

C. Provide shop drawings and submittal data for approval. Refer to Section 15000. No work is to be<br />

installed without approved shop drawings.<br />

D. HVAC Contractor must be certified by the Environmental Protection Agency (EPA) to handle<br />

refrigerant and maintain records of their certification throughout the duration of the project and during<br />

the subsequent one year warrantee period.<br />

E. The HVAC Contractor shall closely coordinate the locations of all roof top equipment with the steel<br />

erector/fabricator and the structural drawings. The contractor shall verify all roof (and slab)<br />

penetration sizes and modify the sizes and or the locations of the penetrations such that the ducts<br />

and the associated duct fittings fit within the structural members. The contractor shall locate the<br />

openings dimensionally from the closest structural member. These requirements apply to both the<br />

Owner furnished equipment and the equipment furnished by the HVAC contractor.<br />

.<br />

F. The HVAC Contractor shall make the preparation for and corrections necessary for the testing,<br />

adjusting and balancing of the HVAC systems.<br />

G. Parts and labor warranty for the Owner furnished equipment is to be furnished by the Owner for a<br />

period of one year. All other products and the labor associated warranty is the responsibility of the<br />

contractor. The service calls for the HVAC shall be made on a 24-hour, seven days a week basis.<br />

H. The contractor shall perform the start-up of the all furnished HVAC equipment.<br />

I. At the completion of the project, the test and balance contractor shall furnish and install<br />

(replace) all of the RTU factory variable sheaves with new fixed sheaves.<br />

1.04 PERMITS - INSPECTIONS<br />

A. Secure and pay for all permits and inspections by regulating authorities.<br />

B. Perform work in accordance with all governing regulations.<br />

1.05 CONTRACT DRAWINGS<br />

A. Heating, ventilating and air conditioning work shown on drawings.<br />

B. Supplementary drawings or details will be furnished if necessary.<br />

C. Refer also to Architectural interior details, floor plans and elevations, structural and other<br />

Cinemark 15500 - 1 Heating, Ventilating and Air Conditioning<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!