H. All plumbing adhesives, joint compound, and sealants within the building envelope<br />

must comply with emission limits outlined in Section 01352 IAQ Management."<br />

3.04 HANGERS AND SLEEVES<br />

A. All hangers shall be of approved materials and spaced in accordance with NFPA No. 13.<br />

B. Sleeves shall be set for all pipes passing through concrete floors and masonry walls.<br />

C. Provide primered escutcheon plates at all exposed wall penetrations.<br />

3.05 AUXILIARY DRAINS<br />

A. Trapped sections<br />

1. Auxiliary drains consisting of plugs, or globe valves and plugs where the capacity of a trapped<br />

pipe section exceeds 5 gallons, shall be provided to drain all points in the system that cannot<br />

be drained back to a main riser as shown on the plans.<br />

2. Field conditions may dictate additional drains which could be determined for bidding<br />

purposed which shall be provided as required by NFPA No.13.<br />

B. Drain Termination<br />

1. Drains are to be piped to a Code approved open-site sanitary drain.<br />

2. If no open-site drain is readily available, the fire protection contractor shall notify the Engineer<br />

in writing at least two weeks prior to bid, otherwise, the sprinkler contractor shall include all<br />

costs (labor, materials, excavation, etc.) for the installation of a suitable open site sanitary<br />

drain.<br />

3.06 INSPECTORS' TEST CONNECTIONS<br />

A. Furnish and install inspectors' test connections as required.<br />

3.07 CONCEALED WORK<br />

A. No work shall be concealed unless inspected and approved by the authority having jurisdiction.<br />

3.08 TESTING<br />

A. All systems:<br />

1. All systems including site piping shall be tested hydrostatically at not less than 200 pounds<br />

per square inch pressure for two hours or at 50 pounds per square inch in excess of<br />

maximum pressure when the maximum pressure to be maintained in the system is in excess<br />

of 150 PSI.<br />

2. The inside sprinkler and standpipe piping shall be installed in such a manner that there will be<br />

no visible leaks when the system is subject to hydrostatic tests.<br />

3. Submit a copy of contractor's material and test certificate signed by installer and Owner's<br />

representative after the installation is tested successfully and accepted by all authorities<br />

having jurisdiction.<br />

4. Following sprinkler installation, a Contractor's Material and Test Certificate per NFPA 13<br />

should be completed and submitted to FM Global to verify that proper hydrostatic testing (200<br />

psi for 2 hrs) has been performed.<br />

3.09 GUARANTY-WARRANTY<br />

A. The sub-contractor shall furnish a written warranty, counter-signed and guaranteed by the General<br />

Contractor, stating that all work executed under this section will be free from defects of materials and<br />

workmanship for a period of one (1) year from the date of final acceptance.<br />

B. The above parties further agree that they will, at their own expense, repair and replace all such<br />

defective work and all other work damaged thereby, which becomes defective during the term of the<br />

Guaranty-Warranty.<br />

END OF SECTION<br />

Cinemark 15300 - 7 Fire Protection<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!