SECTION 15034<br />

HVAC TESTING AND BALANCING<br />

PART 1 - GENERAL<br />

l.01 RELATED DOCUMENTS<br />

A. The general provisions of the Contract, including General and Supplementary Conditions, apply to the<br />

work specified in this Section.<br />

1.02 RELATED WORK SPECIFIED ELSEWHERE<br />

A. All other Sections of Division 15.<br />

B. All other Divisions of the Contract Documents. Refer to each Division's specifications and drawings<br />

for all requirements.<br />

1.03 SCOPE<br />

A. All air handling systems are to be balanced to accomplish flows and other conditions shown or<br />

indicated on the drawings and/or specified herein to the complete satisfaction of the Architect.<br />

B. The balance contractor shall provide all instruments, materials and labor to perform the balancing and<br />

to obtain and record all measurements. However, the preparation for and the corrections necessary<br />

for the testing, adjusting, balancing (including the replacement of sheaves) are the responsibility of<br />

the HVAC contractor. At the completion of the project, the theatre test and balance contractor<br />

shall furnish and install (replace) all of the RTU factory variable sheaves with new fixed<br />

sheaves.<br />

C. The balance contractor shall furnish one electronic copy of reports to the Engineer for all reports<br />

required for this project.<br />

D. Final values obtained from the test and balance shall meet ( 5%) the conditions shown or indicated<br />

on the drawings. Equipment not delivering values meeting or exceeding the stated values shall be<br />

corrected until such specified values are obtained. Note that the air flows shown on the plans,<br />

drawings, and schedules are actual air flows (non-standard CFM) which have been corrected<br />

for local conditions including altitude. The reported air flow values from the test and balance<br />

are also to be actual air flows (non-standard CFM).<br />

E. The Test and Balance (TAB) Contractor shall be independent of the installing HVAC Contractor and<br />

shall be contracted directly to the General Contractor. The TAB Contractor shall be certified by<br />

either National Environmental Balancing Bureau (NEBB) or Associated Air Balance Council (AABC).<br />

Qualifications, procedures and sample of forms shall be submitted for approval before beginning<br />

work.<br />

F. Air Balancing: All space conditioning and ventilation systems shall be balanced to the quantities<br />

specified in these plans, in accordance with the National Environmental Balancing Bureau (NEBB)<br />

Procedural Standards (1983) or Associated Air Balance Council (AABC) National Standards for<br />

Testing and Balancing Heating, Ventilating, and Air Conditioning Systems, fifth edition 1989.<br />

G. Assist the Mechanical Commissioning Agent as per Section 15995.<br />

PART 2 – PRODUCTS :<br />

Not used.<br />

PART 3 - EXECUTION<br />

3.01 General<br />

A. Test all equipment and make all final adjustments and replacements necessary to place the system in<br />

proper operating condition, Operate the system under normal operating conditions for a minimum of 8<br />

hours, and instruct the owner's mechanic in the operation and maintenance of the system.<br />

B. Contractor shall provide for a second start-up of each unit at the beginning of the season opposite<br />

that in which the system is first operated and tested. Report initial and final values.<br />

C. Air Handling, Exhaust and Distribution: Balance the individual rooftop to equipment and adjust<br />

Cinemark 15034 - 1 HVAC Test & Balance<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!