10.03.2015 Views

specs

specs

specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.14 GUARANTEE<br />

A. The Contractor shall and does hereby guarantee for a period of one year from date of final<br />

acceptance by the Architect all work as called for in the various Divisions of these specifications.<br />

When such work is performed by Subcontractors, and where special guarantees are required by<br />

Subcontractors, the Contractor shall secure warranties from said Subcontractors and deliver copies of<br />

same to the Owner upon completion of the work.<br />

B. The Contractor shall replace with new materials and/or equipment any material failing to give<br />

satisfactory service during the guarantee period and shall replace any refrigerant or oil lost during the<br />

guarantee period. Replacement of materials, equipment, oil or refrigerant, including all labor involved,<br />

shall be at no cost to the Owner.<br />

C. Nothing in the above intends or implies that this guarantee shall apply to work which has been abused<br />

or neglected by the Owner.<br />

END OF SECTION<br />

Cinemark 15000 - 9 Mechanical General Conditions<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!