dates in accordance with the General Contractor's schedule.<br />

E. On union projects, the contractor is to be responsible for employing the proper tradesmen per union<br />

jurisdiction, past, present, and future. The subcontractor is also responsible for taking whatever<br />

measures that may be necessary, including composite crews, to settle any labor disputes and insure<br />

job continuity at no additional cost to the Owner. Should questions of union jurisdiction arise, the<br />

contractor shall immediately take steps to settle such disputes and will use such labor as may be<br />

determined to have jurisdiction, at no additional cost to the Owner or General Contractor. Should he<br />

fail to take expeditious action, he will be responsible for the time lost and monetary damages<br />

because of delays arising from such disputes.<br />

F. Provide one HVAC and one plumbing technicians for 24 hours (exact schedule to be<br />

determined by the Owner’s project managers) at the time of the theatre opening.<br />

G. Assist the Mechanical Commissioning agent as per Section 15995.<br />

1.08 COORDINATION OF WORK<br />

A. The Contractor shall coordinate work of this Division with that of other Divisions so that all systems,<br />

equipment and other components of the building will be installed at the proper time, will fit the<br />

available space, and will allow proper service access to those items requiring maintenance. This<br />

means adequate access to all equipment, not just that installed under this Division.<br />

B. Any components of the Mechanical Systems which are installed without regard to the above shall be<br />

removed and relocated as directed by the architect, at no additional cost to the Owner.<br />

C. Where various items of equipment and materials are specified and scheduled, the purpose is to<br />

define the general type and quality level, not to set forth the exact trim required to fit the various types<br />

of ceiling, wall or floor finishes. The Contractor shall provide materials which will fit (both<br />

dimensionally and color) properly the types of finishes actually installed.<br />

D. In the event of conflict with other trades or work, the following priority shall be followed: lighting,<br />

HVAC, plumbing, sprinklers. The HVAC, plumbing, and sprinkler contractors shall provide what ever<br />

materials, offsets, labor etc. required to provide the required coordination and the priorities listed<br />

above.<br />

E. Where the word verify is used on the documents, the contractor shall field verify the existing<br />

conditions and modify the scope of the installation as required to meet the verified conditions without<br />

additional cost to the Owner..<br />

PART 2 - PRODUCTS<br />

2.01 STANDARD PRODUCTS<br />

A. Each item of equipment furnished under this specification shall be essentially the standard product of<br />

the manufacturer. Where two or more units of the same kind or type of equipment are required, these<br />

shall be the products of a single manufacturer. All equipment shall be U.L. approved (labeled) and<br />

shall be manufactured in the U.S.A.<br />

B. All material and equipment shall be new, and of the best quality used in good commercial practice<br />

and shall be the product of a reputable manufacturer. Each major component shall bear a name plate<br />

giving the name and address of the manufacturer and the catalogue number of designation.<br />

2.02 MANUFACTURER'S DIRECTIONS<br />

A. All manufactured articles, materials and equipment shall be applied, installed, connected, erected,<br />

used, cleaned and conditioned as directed by the manufacturers, unless herein specified to the<br />

contrary.<br />

2.03 SUBSTITUTION OF MATERIALS AND EQUIPMENT<br />

A. In general, no substitutions will be allowed. The Contractor shall submit with each request for<br />

approval of substitute material or equipment, sufficient data to show conclusively that it is equivalent<br />

to that specified. Acceptance or rejections of the substitutions when permitted shall be subject to the<br />

approval of the Engineer. Under no circumstances will the Engineer be required to prove that an<br />

item proposed for substitution is equal to the specified items. It is mandatory that the Contractor<br />

Cinemark 15000 - 4 Mechanical General Conditions<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!