10.03.2015 Views

specs

specs

specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9. PDI - Plumbing Drainage Institute.<br />

10. UL - Underwriters' Laboratories.<br />

11. NEC - 2008 National Electrical Code.<br />

12. NEMA - National Electrical Manufacturers Association.<br />

13. SMACNA - Sheet Metal and Air conditioning Contractors National Association.<br />

14. OSHA- Occupational Safety and Health Act of 1990.<br />

15. ARI - American Refrigeration Institute.<br />

16. MSS- Manufacturers Std. Society of Valve and Fittings Ind.<br />

17. ANSI - American National Std. Institute.<br />

18. 2003 Life Safety Code.<br />

19. American Disability Act (ADA).<br />

20. Current Edition of California Building Codes<br />

1.07 SCOPE OF WORK<br />

A. The Contractor shall provide all labor, materials, tools, machinery, equipment, accessories, hardware,<br />

fasteners, layout, supervision, hoisting, scaffolding, shop drawings, cleanup, detailing, packaging,<br />

trucking, freight, delivery, permits, insurance and all services necessary to complete the mechanical<br />

work under this contract in accordance with all codes. All work shall be coordinated with the work of<br />

other trades so as to resolve conflicts without impeding job progress. All out of sequence work shall<br />

be included.<br />

B. The work includes but is not limited to the following systems, equipment and services:<br />

1. Self contained air conditioning units consisting of components indicated on the drawings or<br />

specified herein, including:<br />

a. Rooftop Units.<br />

b. Temperature controls.<br />

2. Air distribution system consisting of components indicated on the drawings or specified<br />

herein, including:<br />

a. Sheet metal ductwork.<br />

b. Grilles, registers, duct insulation, control dampers and fire dampers, etc.<br />

3. Plumbing system consisting of components indicated on the drawings and specified herein,<br />

including:<br />

a. Plumbing fixtures.<br />

b. Domestic hot water supply piping.<br />

c. Domestic cold water supply metering and piping.<br />

d. Drinking water fountains with coolers.<br />

e. Sanitary waste piping.<br />

f. Vent piping.<br />

g. Domestic water heaters.<br />

h. Floor drains.<br />

I. Pipe Insulation<br />

j. Gas metering and piping<br />

k. Grease Traps.<br />

4. Furnishing of shop drawings and brochures.<br />

5. Furnishing of "as-built" drawings.<br />

6. Balancing and adjusting of mechanical systems.<br />

7. Furnishing operating and maintenance manuals.<br />

8. Miscellaneous items as required for complete and functioning systems as indicated on the<br />

drawings and specified herein.<br />

9. All systems, equipment, and services specified herein shall be furnished and installed<br />

complete and ready for use.<br />

10. Installation of a new and complete combination standpipe/sprinkler system.<br />

11. Installation of seismic restraints.<br />

C. The subcontractors understand and agrees that time is of the essence, and in the event overtime or<br />

premium is required to maintain pace with the construction schedule due to the subcontractor’s lack<br />

of progress, it will be performed at no additional cost.<br />

D. The work included herein may not be performed in a continuous cycle but in various stages as<br />

determined by the General Contractor, the Owner, or delivery of Owner furnished items or equipment.<br />

This contractor shall perform the work out of sequence as directed without any additional cost to the<br />

Owner or the General Contractor. The subcontractor shall include any required overtime expense at<br />

no additional cost to the Owner or General Contractor to meet the milestone dates and occupancy<br />

Cinemark 15000 - 3 Mechanical General Conditions<br />

South Napa Century Center XD 12 EnviroDesign, Inc., Bid Issue 7-7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!