2.03 ITEMIZED LIST OF EQUIPMENT<br />

A. Refer to drawings.<br />

PART 3 - EXECUTION<br />

Section 11400<br />

Page 3<br />

3.01 EXAMINATION<br />

A. Prior to installation of the Work of this Section, carefully inspect the installed work of other trades and verify<br />

that such work is complete to the point where this installation may properly commence.<br />

B. Verify that the Equipment may be installed in complete accord with the manufacturer's recommendations and<br />

the intent of the original design.<br />

3.02 DISCREPANCIES<br />

A. In the event of a significant discrepancy, immediately notify the Cinemark USA's Consultant.<br />

B. Do not proceed with installation in areas of discrepancy until related problems have been resolved.<br />

3.03 COORDINATION<br />

A. Coordinate interface requirements for electrical and mechanical connections in a timely manner to permit<br />

orderly progress of the Work.<br />

3.04 INSTALLATION<br />

A. Locate, assemble, position and properly install items of equipment.<br />

B. Leave installed work neat, clean and polished, well fitted into position, level and in proper operating condition.<br />

C. After installation has been completed and items checked (and adjusted where necessary) for satisfactory<br />

operation, arrange for inspection of the equipment. If items are found deficient or unsatisfactory, make<br />

necessary corrections to the approval of the Cinemark USA's Consultant.<br />

D. Concession Equipment supplied must be approved by authorities having jurisdiction, and must have necessary<br />

labels of inspection or approval fixed.<br />

E. Refrigeration compressors shall carry a five year warranty.<br />

F. Ship, deliver and store materials and items of equipment in factory containers with seals and labels intact<br />

wherever practical. Package materials and equipment or components in a manner to prevent damage to and<br />

marring of finished surface.<br />

G. Provide protection for finished surfaces after installation to prevent damage, marring and soiling due to<br />

construction activities. Such protection shall consist of suitable paper, plastic, fiber board or other similar<br />

materials adequately held in place by adhesive, tape or other means which will not stain or mark the equipment<br />

or the surfaces to which it is applied.<br />

H. During installation, clean up daily and deposit rubbish and debris in bin or container supplied by the General<br />

Contractor, who will unpack equipment.<br />

I. Upon completion of installation clean exposed surfaces of dirt, dust and extraneous materials.<br />

END OF SECTION<br />