10.03.2015 Views

specs

specs

specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 10150<br />

TOILET PARTITIONS<br />

PART 1 - GENERAL<br />

1.01 SCOPE<br />

A. Install Toilet Partitions provided by Cinemark USA as indicated by the Contract Documents.<br />

B. Work, items and requirements specified elsewhere that apply and/or relate to this Section include:<br />

1. Rough Carpentry - Section 06100<br />

2. Finish Hardware - Section 08710<br />

3. Ceramic Tile - Section 09310<br />

4. Toilet Accessories - Section 10800<br />

1.02 STANDARDS AND QUALITY<br />

A. Source quality control:<br />

1. Humidity 100% @ 100º F - 1000 hrs.<br />

2. Water Soak @ 105º F - 1000 hrs.<br />

3. Wear resistance: NEMA LP-2.01, 800 cycles.<br />

4. Scratch resistance: Gardner method, 400-600 GM.<br />

1.03 SUBMITTALS<br />

A. Meet requirements of Section 01340 - Submittals.<br />

B. Show methods of anchoring, details of construction, gauge of metal, and hardware.<br />

C. Furnish color samples for color selection by the Architect as shown on plans.<br />

1.04 PRODUCT DELIVERY, STORAGE AND HANDLING<br />

A. Deliver material in manufacturer’s original unopened and undamaged packages.<br />

B. Store in original packaging under protective cover and protect from damage. Stack containers in<br />

accordance with manufacturer’s recommendations.<br />

C. Handle materials in such a manner as to prevent damage to products or finishes.<br />

1.05 COORDINATION<br />

A. Coordinate size and location of partition mounted accessories cut-outs with toilet accessory work.<br />

1.06 GUARANTEE<br />

A. Upon completion and acceptance of the project, furnish to the Owner through the Architect a<br />

written guarantee.<br />

B. Guarantee items and work included in this Section for a period of one (1) year from the date of<br />

acceptance against defects in materials and workmanship.<br />

C. Defects resulting from faulty materials and/or workmanship during the guarantee period shall be<br />

repaired or replaced by the Contractor at his expense.<br />

PART 2 - PRODUCTS<br />

2.01 ACCEPTABLE MANUFACTURERS<br />

A. American Accessories Inc. - NO SUBSTITUTIONS - Furnished by Cinemark USA for<br />

installation by contractor. Contact Amy Babb, American Accessories Inc., 903.465.5005,<br />

National Sales Manager.<br />

B. Mills, Inc. – Bradley Manufacture - NO SUBSTITUTIONS - Furnished by Cinemark USA for<br />

installation by contractor.<br />

2.02 PARTITION TYPES<br />

A. Floor mounted overhead braced: Pennsylvania Series PA-4 by American Accessories or Sentinel<br />

by Bradley.<br />

B. Doors:<br />

NAPA CENTURY CENTER XD 12<br />

#165582

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!