SECTION 09900<br />

PAINTING<br />

PART 1 - GENERAL<br />

1.01 SCOPE<br />

A. Provide Painting work as indicated by the Contract Documents.<br />

B. Examine carefully the Specifications as a whole for work, and be familiar with their provisions for painting.<br />

C. Painting subcontractor shall be responsible for installation of latex caulking as specified in Section 07920.<br />

D. Work in this section includes but is not limited to the following items:<br />

1. Building exterior including mechanical and electrical items:<br />

a. Hollow metal doors and frames.<br />

b. Mechanical and electrical items on the exterior of the roof of the building that are exposed to the<br />

weather including ferrous metal pipe.<br />

c. Other exposed ferrous metal surfaces that are not included above.<br />

d. Other non-ferrous metal surfaces that are not included above that are exposed to public view.<br />

e. Exposed wood surfaces, such as blocking, trim, etc.<br />

f. Exterior concrete columns.<br />

2. Building interior including mechanical and electrical items:<br />

a. Hollow metal frames.<br />

b. Steel handrails, metal stairs and ladders.<br />

c. Drywall surfaces not scheduled for other finish.<br />

d. Ceiling grid where noted in the Drawings.<br />

e. Exposed ferrous metal surfaces that are not listed above.<br />

f. Exposed wood surfaces, such as blocking, doors and trim.<br />

g. Exposed finished concrete floors as indicated in the Drawings.<br />

h. Diffusers, registers and grilles shown on drawings to be painted to match the surrounding surface.<br />

E. Work specified elsewhere that relates to this Section includes:<br />

1. Miscellaneous Metals - Section 05500.<br />

2. Steel Stairs - Section 05510.<br />

3. Sheet Metal Flashing and Trim - Section 07620.<br />

4. Sealants and Caulking - Section 07920.<br />

5. Metal Doors and Frames - Section 08100.<br />

6. Gypsum Wallboard - Section 09250.<br />

7. Acoustical Ceilings - Section 09510.<br />

1.02 DELIVERY AND STORAGE<br />

A. Schedule deliveries to avoid delays and to prevent greater accumulations than can be suitably stored at the site.<br />

B. Store and mix materials in the assigned spaces. Protect floor if it is a finished surface.<br />

C. Gasoline and kerosene shall be stored outside the building in suitable containers marked as to their contents.<br />

D. Oily rags and debris shall be removed from the building at the end of each work period.<br />

E. Assigned storage shall be kept neat and clean. Keep paints covered.<br />

F. Deliver materials in their original unopened containers showing the name of the manufacturer, the grade, and<br />

brand, which shall be subject to the Architect's inspection.<br />

1.03 SUBMITTALS<br />

A. Refer to Section 01340 - Submittals.<br />

B. Submit (2) 6"x6" samples of each paint color including texture to architect two weeks before ordering<br />

materials.<br />

B. Provide product data or MSDS indicating VOC emissions in grams/liter (g/L) for the following products:<br />

1. Interior paints & coatings to comply with standards identified in Section 01352 IAQ Management.<br />

PART 2 - PRODUCTS<br />

2.01 MATERIALS<br />

A. Paint materials and wood stain materials shall be best grade and appropriate type as manufactured by<br />

Benjamin-Moore Company, Sherwin-Williams, Pratt and Lambert, Pittsburg Paints, Glidden.<br />