PART 1 - GENERAL<br />

1.01 SCOPE<br />

A. Provide Special Coatings work at locations listed and as described in the Contract Documents.<br />

1. Exposed exterior concrete wall panels.<br />

2. Stucco.<br />

B. Work, items and requirements specified elsewhere that apply and/or relate to this Section include:<br />

1. Concrete Wall Panels – Section 03411<br />

2. Concrete Masonry Units – Section 04200<br />

3. Sheet Metal Flashing and Trim – Section 07620<br />

4. Portland Cement Plaster/Stucco – Section 09220<br />

5. Gypsum Wallboard - Section 09250<br />

6. Painting - Section 09900<br />

SECTION 09800<br />

SPECIAL COATINGS<br />

1.02 QUALIFICATIONS<br />

A. Materials shall be applied by skilled craftsmen trained to do this type work and employed by an approved<br />

applicator approved by the manufacturer of the materials.<br />

B. Applicator shall present proof of having had previous experience in doing this type of work.<br />

1.03 SUBMITTALS<br />

A. Refer to Section 01340 - Submittals.<br />

B. Submit samples of coating applied to a 6"x 6" substrate sample. Include on backside: project name, material<br />

identification, color, and provision for Architect's approval.<br />

C. Before commencing work, supply samples selected by Architect of adequate size, of each coating type for<br />

Architect's approval.<br />

D. Provide product data or MSDS indicating VOC emissions in grams/liter (g/L) for the following products:<br />

1. Comply with California’s South Coast Air Quality Management District (SCAQMD) #1113 identified in<br />

Section 01352.<br />

1.04 PRODUCT HANDLING<br />

A. Deliver and store materials undamaged, in original containers, with manufacturer's labels and seals intact.<br />

B. A room will be designated for storage of coating materials and equipment. Keep room neat and clean, and<br />

surrounding surfaces protected against damage.<br />

C. Material temperature shall be minimum of 35 degrees F to 100 degrees F.<br />

1.05 GUARANTEE<br />

A. Upon completion and acceptance of the project, the special coatings subcontractor and the General Contractor<br />

shall furnish a joint written guarantee on the special coatings.<br />

B. Provide limited warranty for materials and work included in this section for a period of five years from the date<br />

of acceptance, against the following:<br />

1. Bond and weathering.<br />

2. Waterproofing above grade<br />

C. Defects resulting from faulty materials and/or workmanship that are found during the guarantee period shall be<br />

replaced by the subcontractor at his expense.<br />

1.06 ENVIRONMENTAL CONDITIONS<br />

A. Minimum surface temperature of 50º F 24 hours before, during and 24 hours after application until cured.<br />

B. No precipitation for 24 hours preceding or predicted for 24 hours after application.<br />

C. The following conditions may require dampening the surface prior to and during application:<br />

1. Wind-caused rapid drying of surface.<br />

2. Excessive surface temperature.<br />

3. Excessive air temperature.<br />

4. Direct sun.<br />

5. Low humidity.<br />

1.07 PROTECTION<br />

NAPA CENTURY CENTER XD 12<br />

#165582