Section 09250<br />

Page 4<br />

4. No fill coat is necessary on interior angles.<br />

F. Finishing<br />

1. After topping compound is set, a finished coat of topping compound shall be spread evenly over and extending<br />

slightly over the fill coat on joints and feathered to a smooth, uniform finish over tapered edges.<br />

2. The finished joint shall not protrude beyond the plane of the surface.<br />

3. Taped angles shall receive a finish coat to cover the tape and taping compound, and provide a true angle.<br />

4. Where necessary, sanding shall be done between coats and following the final applications of compound<br />

to provide a smooth surface, ready for decoration.<br />

G. Taping compound shall be applied to fastener depressions followed, when hardened, by at least two coats of<br />

topping compound, leaving depressions level with the plane of the surface.<br />

H. Taping compound shall be applied to bead and trim and shall be feathered out from the ground to the plane of<br />

the surface. When hardened, this shall be followed by two coats of topping compound each extending slightly<br />

beyond the previous coat. The finish coat shall be feathered from the ground to the plane of the surface and<br />

sanded as necessary to provide a flat, smooth surface ready for decoration.<br />

I. Sand finish work to a smooth surface, true and plane.<br />

3.03 SHEATHING<br />

A. Provide Dens-Glass Gold sheathing where indicated on drawings. Install sheathing in accordance with<br />

manufacturer’s instructions and applicable instructions in GA-253 and ASTM C 1280.<br />

B. Install Dens-Glass Gold sheathing with gold side out.<br />

C. Use maximum lengths possible to minimize number of joints.<br />

D. Wood framing: Attach Dens-Glass Gold sheathing to wood framing with nails spaced 4” o.c. at perimeter for<br />

racking shear resistance; 8” o.c. at perimeter where there are framing supports and where racking shear<br />

resistance is not required; and 8” o.c. along intermediate framing in field for both conditions.<br />

E. Metal framing: Attach Dens-Glass Gold sheathing to metal frmaing with screws spaced 8” o.c. at perimeter<br />

where there are framing supports; and 8” o.c. along intermediate framing in field.<br />

F. Drive fasteners to bear tight against and flush with surface of sheathing. Do not countersink.<br />

G. Locate fasteners minimum K’ from edges and ends of sheathing panels.<br />

H. Building paper: If required, install building paper or equal with flashing around openings.<br />

I. Finishing:<br />

1. Seal fasteners using Dow Corning 795 or Borden HPPG Elmers Siliconized Acrylic Latex Caulk or<br />

equilavent.<br />

2. Finish joints using Dow Corning 795 or Borden HPPG Elmers Siliconized Acrylic Latex Caulk or<br />

equilavent. Reinforce with 2” wide 10x10 glass mesh Quick Tape or equilavent.<br />

3.04 CLEANING AND PATCHING<br />

A. Refer to Section 01710 - Cleaning.<br />

B. Clean exposed drywall surfaces free of soil and stain that would affect finish.<br />

C. Repair, or remove and replace defective work.<br />

END OF SECTION<br />

NAPA CENTURY CENTER XD 12<br />