10.03.2015 Views

specs

specs

specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PART 1- GENERAL<br />

SECTION 09220<br />

LATH AND PORTLAND CEMENT PLASTER<br />

1.01 SCOPE<br />

A. Provide Lath and Plaster work as indicated by the Contract Documents.<br />

B. Work items, and requirements specified elsewhere that relate and/or apply to this Section include:<br />

1. Light gage Metal Framing - Section 05400<br />

2. Concrete Unit Masonry - Section 04200<br />

3. Sheet Metal Flashing and Trim Section 07620.<br />

4. Special Coatings - Section 09800<br />

1.02 STANDARDS AND QUALITY<br />

A. Meet requirements and recommendations of applicable portions of Standards listed.<br />

1. Metal Lath Association MLA<br />

2. National Lime Association NLA<br />

3. Plaster Information Bureau PIB<br />

4. Underwriter's Laboratories, Inc. UL<br />

5. ML/SFA (Metal Lath/ Steel Framing Association).<br />

6. PCA (Portland Cement Association) Plaster (Stucco) Manual.<br />

7. Lath & Plaster Systems Manual published by Texas Lathing and Plastering Contractors Association and<br />

Texas Bureau for Lath & Plaster.<br />

1.03 SYSTEM DESCRIPTION<br />

A. Fabricate vertical wall and furred space framing to limit finish surface deflection to L/180 under lateral point<br />

load of 100 lbs.<br />

B. Fabricate horizontal ceiling and soffit framing to limit finish surface to L/360 deflection under superimposed<br />

dead loads and wind uplifts.<br />

1.04 SUBMITTALS<br />

A. Prepare 2 samples, each approximately 2 feet square, at a location on the site as directed by the Architect.<br />

A. General: Submit in accordance with SECTION 01340 – SUBMITTALS.<br />

B. Product Data: Submit product data with installation instructions.<br />

C. Shop Drawings: Submit a diagram of proposed control joint and expansion joint layout prior to starting work.<br />

D. Samples: Include color chips for color selection.<br />

G. Recycled Content:<br />

1. Indicate recycled content; indicate percentage of pre-consumer and post-consumer recycled content per<br />

unit of product.<br />

2. Indicate material cost of product less labor included in project.<br />

3. If recycled content product is part of an assembly, indicate the percentage of recycled content product in<br />

the assembly by weight.<br />

H. Local/Regional Materials:<br />

1. Sourcing location(s): Indicate location of extraction, harvesting, and recovery; indicate distance between<br />

extraction, harvesting, and recovery and the project site.<br />

2. Manufacturing location(s): Indicate location of manufacturing facility; indicate distance between<br />

manufacturing facility and the project site.<br />

3. Product Value: Indicate dollar value of product containing local/regional materials; include materials cost<br />

only.<br />

4. Product Component(s) Value: Where product components are sourced or manufactured in separate<br />

locations, provide location information for each component. Indicate the percentage by weight of each<br />

component per unit of product.<br />

B. Provide product data or MSDS indicating VOC emissions in grams/liter (g/L) for the following products:<br />

1. Plaster: Comply with California’s South Coast Air Quality Management District (SCAQMD) #1113<br />

identified in Section 01352.<br />

1.05 DELIVERY AND STORAGE<br />

NAPA CENTURY CENTER XD 12<br />

#165582

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!