Document 00300<br />

Page 4<br />

b. Water Reuse $____________________________<br />

c. Other Division 11 $<br />

DIV. 12 a. Unloading Owner Furnished Items $____________________________<br />

b. Rolling Shades $____________________________<br />

c. Foot Grid Entrance Systems $____________________________<br />

DIV. 13 PV Electrical Power Equipment $____________________________<br />

DIV. 14 Elevator $____________________________<br />

DIV. 15 a. HVAC $<br />

b. Plumbing $<br />

c. Fire Sprinkler $<br />

d. Subsoil drainage system $<br />

DIV. 16 a. Lighting Fixtures (Labor, receipt & storage ) $<br />

b. Electrical $<br />

c. Fire Alarm System $<br />

DIV. 17 Energy Management System $<br />

GRAND TOTAL FOR CONTRACT: $<br />

BID ALTERNATES<br />

Alternate 01: Deduct cost for added corrugated exterior columns<br />

$___________________________<br />

Alternate 02:<br />

$___________________________<br />

Alternate 03:<br />

$___________________________<br />

CONTRACTOR PROPOSED ALTERNATES<br />

Voluntary alternates proposed by the contractor should be submitted on a separate sheet attached to this form.<br />

TIME OF COMPLETION<br />

A. If awarded the Contract, the undersigned will complete the shell and interior work as bid within 240<br />

calendar days from notice to proceed.<br />

B. Cinemark USA will jointly occupy the building for equipping beginning 60 days prior to scheduled<br />

completion date. The following schedule lists the key milestone dates that must occur in order for the<br />

Contractor to have the building ready for Cinemark USA to begin work<br />

C. Schedule of Milestones:<br />

MILESTONE DESCRIPTION<br />

CONTRACT CALENDAR DAYS<br />

240<br />

Approx. weeks prior to completion<br />

* Notice to proceed, site mobilization 34<br />

Start site clearing/excavation and building pad 33<br />

* Start underground utilities and foundations 31<br />

Complete site grading, start paving 29<br />

* Start masonry / tilt walls 28<br />

NAPA CENTURY CENTER XD 12<br />