Section 08810<br />

Page 3<br />

A. Field Measurement:<br />

1. Measure size of frame to receive glass.<br />

2. Compute actual glass size, allowing for edge clearances.<br />

3. Coordinate locations of j-boxes, required openings, etc. Prior to fabrication. Size per lobby elevations.<br />

B. Preparation of Surfaces:<br />

1. Remove protective coatings from surfaces to be glazed.<br />

2. Clean glass and glazing surfaces, to remove dust, oil and contaminants, and wipe dry.<br />

C. Mirror Edge Preparation:<br />

1. Apply mirror edge sealant to mirror edges extending sealant 1” on the back of mirror.<br />

2. Allow to dry thoroughly before handling.<br />

3. Cut edges of mirrors should be ground smooth.<br />

3.03 INSTALLATION<br />

A. Install glass in accordance with manufacturer's recommended instructions and comply with the procedures<br />

recommended in the "Glazing Manual" of the FGJA.<br />

B. Do not cut, seam, nip or abrade tempered, heat strengthened, coated, or insulated glass.<br />

C. Be sure exterior light of glass is set toward the building exterior.<br />

D. Gasket Glazing:<br />

1. Cut gasket with mitered corners to length of channel without stretching.<br />

2. Apply gasket outside fixed edge of rabbet perimeter.<br />

3. Place setting blocks at quarter points of sill rabbet.<br />

4. Place glass on setting block and center horizontal.<br />

5. Apply gasket to inside stop, mitering corners.<br />

E. Do not force or spring glass into place. Provide adequate clearances at edges with shims and spacer blocks as<br />

required.<br />

F. Glass shall be properly sized so that it has correct bearing and concealment as per FGJA.<br />

G. If used on insulated glass, breather tubes must be closed within 30 days of manufacture and preferably within<br />

24 hours after reaching destination; tubes are not to be closed in direct sunlight or unusually hot or cold days.<br />

Do not install units prior to closing breather tubes.<br />

H. Mirrors:<br />

1. Wait until air conditioning is operating before installation.<br />

2. Support mirrors installed on walls from the bottom until mastic sets up.<br />

3. Follow Mirror Mastic manufacturer's installation guidelines to ensure proper installation of mirrors.<br />

I. Decorative Glass:<br />

1. Wait until air conditioning is operating before installation.<br />

2. Support mirrors installed on walls from the bottom until mastic sets up.<br />

3. Follow Mirror Mastic manufacturer's installation guidelines to ensure proper installation of mirrors.<br />

3.04 CLEANING<br />

A. Refer and comply with Section 01710-Cleaning.<br />

B. Remove excess compound from installed glass.<br />

C. Remove labels from glass surface as soon as installed.<br />

D. Wash and polish both faces of glass.<br />

3.05 PROTECTION<br />

A. Attach crossed streamers away from glass face.<br />

B. Do not apply markers to glass surfaces.<br />

C. Replace damaged glass.<br />

END OF SECTION<br />