A<br />

PART 1 - GENERAL<br />

SECTION 07920<br />

SEALANTS AND CAULKING<br />

1.01 SCOPE<br />

A. Provide Sealant and Caulking work as indicated by the Contract Documents.<br />

B. Work, items and requirements specified elsewhere that apply and/or relate to this Section include:<br />

1. Cast-in-Place Concrete - Section 03300<br />

2. Concrete Wall Panels - Section 03411.<br />

3. Exterior Insulation and Finish System – Section 07240.<br />

4. Sheet Metal Siding, Flashing and Trim - Section 07620<br />

5. Aluminum Entrances and Storefront - Section 08410<br />

6. Gypsum Wallboard - Section 09250<br />

7. Painting - Section 09900<br />

C. The storefront installer is responsible for all interior and perimeter joint sealant installation.<br />

D. Interior latex caulking shall be performed by painting subcontractor.<br />

1.02 STANDARDS AND QUALITY<br />

A. Meet requirements and recommendations of applicable portions of standards listed.<br />

1. American Society for Testing and Materials ASTM<br />

2. Federal Specifications FedSpec<br />

1.03 SUBMITTALS<br />

A. Before ordering material, submit for the Architect's approval complete manufacturer's specifications of<br />

materials specified in this Section in accordance with Section 01340 - Submittals.<br />

B. Product data sheet or MSDS indicating VOC emissions in grams/Liter (g/L).<br />

1.04 DELIVERY AND STORAGE<br />

A. Deliver and store materials in their original unopened containers bearing the manufacturer's label.<br />

B. Deliver, store, and handle all materials so as to prevent the entrance of foreign materials and damage of<br />

materials by water or breakage.<br />

C. Store materials to allow free access to the work.<br />

D. Schedule deliveries to avoid delay in the work.<br />

E. Protect materials from damage during storage.<br />

1.05 GUARANTEE<br />

A. Upon completion and acceptance of the project, furnish to the Owner through the Architect a written<br />

guarantee.<br />

B. Guarantee items and work included in this Section for a period of two years from the date of acceptance<br />

against defective workmanship and/or materials.<br />

C. Defects resulting from faulty materials and/or workmanship during the guarantee period shall be<br />

repaired or replaced by the Contractor at his expense.<br />

D. This guarantee shall be issued by the General Contractor and the applicator for the full two years.<br />

PART 2 - PRODUCTS<br />

2.01 ACCEPTABLE MANUFACTURERS<br />

A. Dow Corning<br />

B. Pecora Corp.<br />

C. Sika<br />

D. Sonneborn Building Product, Inc.<br />

E. Tremco Manufacturing Co.<br />

F. Sherwin Williams Co.<br />

NAPA CENTURY CENTER XD 12<br />