10.03.2015 Views

specs

specs

specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 07410<br />

Page 3<br />

A. Panels shall have 12” exposure with smooth face, 1-1/2” deep, with concealed fasteners and interlocking<br />

sidelap.<br />

B. Panels should be factory formed, 40’ maximum length.<br />

C. Attachment to metal supports with #10 x ½” TEKS screws at maximum spacing of 5’-0” on center or per local<br />

code, whichever is greater.<br />

D. Provide material with maximum amount of recycled content available that achieves performance requirements<br />

of this Section,<br />

E. Provide material with maximum amount of regional (within 500 miles) material feasible that achieves<br />

performance requirements of this Section,<br />

PART 3 - EXECUTION<br />

3.01 INSTALLATION<br />

A. Comply with manufacturer’s standard instructions and conform to standards set forth in the Architectural Sheet<br />

Metal Manual published by SMACNA, in order to achieve a watertight installation.<br />

B. Install panels in such a manner that horizontal lines are true and level and vertical lines are plumb.<br />

C. Install starter and edge trim before installing roof panels.<br />

D. Remove protective strippable film prior to installation of panels.<br />

E. Attach panels using manufacturer’s standard clips and fasteners, spaced in accordance with approved shop<br />

drawings.<br />

F. Do not allow panels or trim to come into contact with dissimilar materials.<br />

G. Protect installed panels and trim from damage caused by adjacent construction until completion of installation.<br />

H. Remove and replace any panels or components which are damaged beyond successful repair.<br />

I. Install trim to maintain visual continuity of system.<br />

J. Install sealants to prevent water penetration. Apply sealers per manufacturer’s instructions and specified in<br />

Section 07920.<br />

3.02 CLEANING<br />

A. Clean any grease, finger marks or stains from the panels per manufacturer’s recommendations.<br />

B. Remove all scrap and construction debris from the site.<br />

3.03 FINAL INSPECTION<br />

A. Final inspection will be performed by the Architect of Record or designee.<br />

END OF SECTION<br />

NAPA CENTURY CENTER XD 12<br />

#165582

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!