8. If application is not complete at end of work day, seal exposed edges with mastic.<br />

Section 07110<br />

Page 3<br />

3.03 FIELD QUALITY CONTROL<br />

A. Prior to applying protection course, inspect for voids, ruptures, or other damage; repair any encountered.<br />

3.04 INSTALLATION OF DRAINAGE BOARD<br />

A. Apply drainage board immediately following the successful water test.<br />

B. Install in accordance with manufacturer’s instructions.<br />

C. Cut pieces from roll to required length. Cut to fit around penetrations and at perimeter.<br />

D. Secure sheets to waterproofing membrane with adhesive. Place with filter fabric to earth.<br />

E. Overlap and secure filter fabric on adjacent sheets.<br />

B. Complete backfilling as soon as possible after application of drainage board; within 7 days maximum.<br />

END OF SECTION<br />

NAPA CENTURY CENTER XD 12<br />