10.03.2015 Views

specs

specs

specs

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E. See also Section 01600 paragraph 1.06 for substitution procedures after the Contract is awarded.<br />

Document 00100<br />

Page 3<br />

1.10 AWARD OF CONTRACT<br />

A. Bids shall be privately opened. The Owner reserves the right to reject any and all bids and to award a contract,<br />

or contracts, in accordance with his best interests.<br />

1.11 ADMINISTRATION<br />

A. AIA Documents will be utilized for the job administration, including Owner-Contractor Agreement Form<br />

A101. All forms will be provided by the Contractor.<br />

END OF SECTION<br />

NAPA CENTURY CENTER XD 12<br />

#165582

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!