Section 05510<br />

Page 3<br />

H. Dimensions and thicknesses of framing, supports landings, treads and risers, balustrades and railings are<br />

minimums. Do not decrease. Increase as necessary to support design loads.<br />

I. Fabricate work complete with components required for anchoring and supporting.<br />

J. Stringers shall be structural steel shapes with 3/8 in. steel end plates on exposed ends of walls strings and outer<br />

strings as indicated.<br />

K. Weld stair stringers to structural steel landing trimmer.<br />

L. Interior Stairs:<br />

1. Form treads and risers of 12 ga. steel to profiles indicated to receive concrete tread fill.<br />

2. Construct intermediate landings of galvanized steel deck as specified to receive concrete fill.<br />

3. Fabricate wall rails with malleable steel brackets of design similar to that indicated, spaced as shown.<br />

(Refer to Section 05500 - Miscellaneous Metals.)<br />

M. Exterior Stairs:<br />

1. Treads and landings to be 1 ½” Grip Strut grating.<br />

2. Fabricate wall rails with malleable steel brackets of design similar to that indicated, spaced as shown.<br />

(Refer to Section 05500 - Miscellaneous Metals.)<br />

3.02 INSTALLATION<br />

A. Install metal expansion shields and fastenings, anchors and supports in stair well walls as required to stabilize the<br />

stairs and landings under stipulated loading conditions and to the satisfaction of the Authorities. Secure bottom<br />

riser to concrete slab mechanically.<br />

B. Provide temporary supports and bracing required to position stairs.<br />

C. Do drilling, cutting and fitting necessary to attach this work to adjoining work and make it complete.<br />

D. Make joints tight, smooth and leave completed work straight, true, clean and smooth.<br />

E. Where fastenings or anchors have to be built in by other trades supply necessary templates, instruction and<br />

supervision to ensure satisfactory installation.<br />

F. Wood plugs for fixing to walls will not be permitted. Use metal anchoring devices.<br />

G. Clean work thoroughly and brush on prime paint and touch up shop coat where omitted or damaged during<br />

erection. Paint field welds. Work paint well into joints, crevices, interstices and open spaces.<br />

3.03 FINISHING<br />

A. Prime Painting:<br />

1. Thoroughly clean ferrous metals, by methods suitable to remove burrs, weld spatter, rust, loose mill scale,<br />

oil, grease, dirt and other foreign matter.<br />

2. Shop apply one coat of prime paint to surfaces except those requiring field welding. Brush on thoroughly<br />

and work well into crevices and interstices.<br />

3. After erection and installation, clean the work and apply field touch-up of same formulas as shop coat to<br />

damaged or unpainted surfaces. Work paint well into joints, crevices, interstices and open spaces.<br />

END OF SECTION<br />