- Page 1:
PROJECT MANUAL 1807 Ross Avenue Sui
- Page 5 and 6:
Napa Century Centter XD 12 - Napa,
- Page 7:
Napa Century Center XD 12 - Napa, C
- Page 13:
Section 15000 Section 15034 Section
- Page 16 and 17:
TABLE OF CONTENTS Page 2 DIVISION 4
- Page 19 and 20:
1.01 PROJECT NAPA CENTURY CENTER XD
- Page 21:
E. See also Section 01600 paragraph
- Page 25 and 26:
BID FORM FROM: ____________________
- Page 27 and 28:
Document 00300 Page 3 CONTRACTOR: T
- Page 29 and 30:
Document 00300 Page 5 Start plumbin
- Page 31:
BID GUARANTEE Document 00300 Page 7
- Page 35:
SECTION 00700 GENERAL CONDITIONS PA
- Page 38 and 39:
Document 00800 Page 2 “Contractor
- Page 40 and 41:
Document 00800 Page 4 3.18.1 In the
- Page 42 and 43:
Document 00800 Page 6 7.4 In the fi
- Page 44 and 45:
Document 00800 Page 8 Add Paragraph
- Page 46 and 47:
A. Workers Compensation Insurance i
- Page 48 and 49:
Document 00800 Page 12 Contractor i
- Page 50 and 51:
Document 00800 Page 14 B. Commercia
- Page 52 and 53:
Document 00800 Page 16 13.8 NO THIR
- Page 54 and 55:
Document 00800 Page 18 EXHIBIT "C'
- Page 56 and 57:
Document 00800 Page 20 EXHIBIT "C"
- Page 58 and 59:
e. Training for Contractor personne
- Page 60 and 61:
Section 01020 Page 2 1.05 ADJUSTMEN
- Page 62 and 63:
Section 01340 Page 2 F. Notify Arch
- Page 64 and 65:
Section 01340 Page 4 50. Painting 5
- Page 66 and 67:
Appendix B REGIONALLY MANUFACTURED
- Page 68 and 69:
Appendix D CERTIFIED WOOD INFORMATI
- Page 70 and 71:
PART 3 EXECUTION Section 01351 Page
- Page 72 and 73:
NAPA CENTURY CENTER XD 12 #165582 S
- Page 74 and 75:
Section 01352 Page 2 a. Identify po
- Page 76 and 77:
Section 01352 Page 4 Appendix A SAM
- Page 79 and 80:
PART 1 - GENERAL SECTION 01410 TEST
- Page 81 and 82:
PART 1 - GENERAL SECTION 01500 CONS
- Page 83 and 84:
PART 1 - GENERAL SECTION 01600 MATE
- Page 85 and 86:
Section 01600 Page 3 PROJECT: CENTU
- Page 87 and 88:
PART 1 - GENERAL 1.01 REQUIREMENTS
- Page 89:
PART 1 - GENERAL 1.01 RELATED WORK
- Page 92 and 93:
Section 01730 Page 2 1.07 MANUAL FO
- Page 94 and 95:
1.05 SUBMITTALS REQUIRED A. Submit
- Page 97 and 98:
Section 01810 Page 1 SECTION 01810
- Page 99 and 100:
Section 01811 Page 1 SECTION 01811
- Page 101 and 102:
Section 01811 Page 3 P. Perform fie
- Page 103:
END OF SECTION Section 01811 Page 5
- Page 106 and 107:
Section 02200 Page 2 G. Erect batte
- Page 108 and 109:
Section 02200 Page 4 I. Place engin
- Page 111 and 112:
SECTION 02362 TERMITE CONTROL PART
- Page 113 and 114:
SECTION 02351 CONCRETE FOOTINGS PAR
- Page 115 and 116:
SECTION 02810 PLANTING IRRIGATION P
- Page 117:
3. Micro-sprinklers. 4. Bubbler-sty
- Page 120 and 121:
NAPA CENTURY CENTER XD 12 #165582 S
- Page 122 and 123:
Section 02825 Page 4 3.06 PROTECTIO
- Page 124 and 125:
Section 02810 Page 2 4. Agenda: a.
- Page 126 and 127:
2.6 SOIL CONDITIONERS Section 02810
- Page 129 and 130:
SECTION 03100 STRUCTURAL CONCRETE F
- Page 131 and 132:
2.08. MANUFACTURED UNITS A. Round c
- Page 133 and 134:
SECTION 03200 CONCRETE REINFORCING
- Page 135:
3.02. PLACEMENT Section 03200 Page
- Page 138 and 139:
Section 03250 Page 2 D. Local / Reg
- Page 141 and 142: SECTION 03300 STRUCTURAL CONCRETE P
- Page 143 and 144: PART 2 - PRODUCTS Section 03300 Pag
- Page 145 and 146: Section 03300 Page 5 D. Documentati
- Page 147 and 148: Section 03300 Page 7 mixing water a
- Page 149: Section 03300 Page 9 truck during p
- Page 152 and 153: Section 03411 Page 2 Accepted sampl
- Page 155 and 156: SECTION 03600 GROUTING STEEL BASE P
- Page 157 and 158: Section 04100 Page 1 SECTION 04100
- Page 159: Section 04100 Page 3 D. Provide mat
- Page 162 and 163: Section 04210 Page 2 d. Product Com
- Page 164 and 165: Section 04210 Page 4 B. Lay only dr
- Page 166 and 167: Section 04210 Page 6 A. Contractor
- Page 168 and 169: 2. Steel Structures Painting Manual
- Page 170 and 171: Section 05100 Page 4 C. Provide pro
- Page 172 and 173: Section 05100 Page 6 (1) In accorda
- Page 175 and 176: SECTION 05200 STEEL JOISTS PART 1 -
- Page 177: PART 3 - EXECUTION Section 05200 Pa
- Page 180 and 181: Section 05300 Page 2 product during
- Page 183 and 184: SECTION 05320 METAL FLOOR DECK PART
- Page 185 and 186: SECTION 05330 COMPOSITE METAL FLOOR
- Page 187 and 188: Section 05330 Page 3 A. Composite M
- Page 189 and 190: PART 1 - GENERAL NAPA CENTURY CENTE
- Page 191: Section 05400 Page 3 F. Protective
- Page 195: Section 05500 Page 3 B. Apply one s
- Page 198 and 199: Section 05510 Page 2 3. If recycled
- Page 201 and 202: Section 05520 Page 1 SECTION 05520
- Page 203: Section 05520 Page 3 manufacturer's
- Page 206 and 207: Section 05721 Page 2 G. Provide mat
- Page 209 and 210: SECTION 05810 EXPANSION JOINT COVER
- Page 211 and 212: 2.4 FINISHES A. Refer to drawings f
- Page 213 and 214: PART 1 - GENERAL 1.01 SCOPE A. Prov
- Page 215: Section 06100 Page 3 A. Attach work
- Page 218 and 219: Section 06200 Page 2 4. Engineered
- Page 220 and 221: Section 07110 Page 2 PROPERTIES TES
- Page 223 and 224: PART 1 - GENERAL SECTION 07210 BUIL
- Page 225 and 226: PART 1 - GENERAL 1.01 SECTION INCLU
- Page 227: Section 07410 Page 3 A. Panels shal
- Page 230 and 231: Section 07420 Page 2 4. Product Com
- Page 233 and 234: PART 1 - GENERAL SECTION 07535 FULL
- Page 235 and 236: Section 07535 Page 3 B. Membrane sy
- Page 237: Section 07535 Page 5 3.06 CLEANING
- Page 240 and 241: Section 07610 Page 2 1. Show panel
- Page 242 and 243:
Section 07610 Page 4 1. Clean and d
- Page 244 and 245:
Section 07620 Page 2 B. Galvanized
- Page 246 and 247:
Section 07920 Page 2 2.02 MATERIALS
- Page 249 and 250:
PART 1 - GENERAL NAPA CENTURY CENTE
- Page 251:
Section 08100 Page 3 6. Hardware fu
- Page 254 and 255:
Section 08212 Page 2 B. Manufacture
- Page 257 and 258:
PART 1 - GENERAL SECTION 08410 ALUM
- Page 259 and 260:
4. The system shall provide fully r
- Page 261 and 262:
PART 1 - GENERAL SECTION 08625 TRAN
- Page 263 and 264:
Section 08625 Page 3 2” extruded
- Page 265:
Section 08625 Page 5 C. All Fastene
- Page 268 and 269:
NAPA CENTURY CENTER XD 12 #165582 S
- Page 270 and 271:
Section 08710 Page 4 03 Ext. audito
- Page 273 and 274:
PART 1 - GENERAL SECTION 08810 GLAS
- Page 275:
Section 08810 Page 3 A. Field Measu
- Page 278 and 279:
Section 08920 Page 2 3. At connecti
- Page 280 and 281:
Section 08920 Page 4 9. Provide gut
- Page 282 and 283:
Section 09220 Page 2 A. Manufacture
- Page 284 and 285:
Section 09220 Page 4 1. Space hange
- Page 286 and 287:
Section 09220 Page 6 C. Defects res
- Page 288 and 289:
Section 09250 Page 2 F. Adhesive: A
- Page 290 and 291:
Section 09250 Page 4 4. No fill coa
- Page 292 and 293:
Section 09310 Page 2 H. Edge Protec
- Page 295 and 296:
SECTION 09510 ACOUSTICAL CEILINGS P
- Page 297:
Section 09510 Page 3 3.02 INSTALLAT
- Page 300 and 301:
Section 09650 Page 2 1. Coved base,
- Page 303 and 304:
PART 1 - GENERAL 1.01 SCOPE A. Prov
- Page 305 and 306:
PART 1 - GENERAL 1.01 SCOPE A. Prov
- Page 307 and 308:
Section 09800 Page 3 2. Sherwin-Wil
- Page 309 and 310:
SECTION 09900 PAINTING PART 1 - GEN
- Page 311:
Section 09900 Page 3 2nd coat Sherw
- Page 314 and 315:
Section 09950 Page 2 B. Apply using
- Page 317 and 318:
SECTION 09960 HIGH PERFORMANCE COAT
- Page 319 and 320:
Section 09960 Page 3 PART 3 - EXECU
- Page 321 and 322:
Section 09960 Page 5 H. Transparent
- Page 323 and 324:
PART 1 - GENERAL 1.01 SCOPE A. Prov
- Page 325 and 326:
SECTION 10150 TOILET PARTITIONS PAR
- Page 327 and 328:
PART 1 - GENERAL SECTION 10200 LOUV
- Page 329 and 330:
D. Provide material with maximum am
- Page 331 and 332:
PART 1 - GENERAL SECTION 10260 PROT
- Page 333 and 334:
PART 1 - GENERAL NAPA CENTURY CENTE
- Page 335 and 336:
SECTION 10800 TOILET ACCESSORIES PA
- Page 337 and 338:
PART 1 GENERAL SECTION 11201 RAINWA
- Page 339 and 340:
Section 11201 Page 3 1.6 WARRANTY A
- Page 341 and 342:
SECTION 11202 WATER REUSE PART 1 -
- Page 343:
Section 11202 Page 3 2. Run reclaim
- Page 346 and 347:
Section 11400 Page 2 1. Forest Stew
- Page 349 and 350:
PART 1 - GENERAL SECTION 12484 FOOT
- Page 351:
PART 3 - EXECUTION Section 12484 Pa
- Page 354 and 355:
Section 12494 Page 2 D. Electrical
- Page 356 and 357:
Section 12494 Page 4 2. Provide sha
- Page 358 and 359:
Section 12494 Page 6 c. Connect mas
- Page 360 and 361:
Section 12494 Page 8 END OF SECTION
- Page 362 and 363:
Section 13600 Page 2 ASTM E1362- St
- Page 364 and 365:
Section 14240 Page 2 10. Machine Ro
- Page 366 and 367:
Section 14240 Page 4 1. If a physic
- Page 368 and 369:
Section 14240 Page 6 E. Buffers: Pr
- Page 370 and 371:
Section 14240 Page 8 A. Before star
- Page 373 and 374:
PART 1 - GENERAL 1.01 RELATED DOCUM
- Page 375 and 376:
9. PDI - Plumbing Drainage Institut
- Page 377 and 378:
submit (email) prior to bid to the
- Page 379 and 380:
transparencies. Enter thereon, in a
- Page 381:
3.14 GUARANTEE A. The Contractor sh
- Page 384 and 385:
dampers, registers, and diffusers s
- Page 387 and 388:
PART 1 - GENERAL 1.01 RELATED DOCUM
- Page 389 and 390:
2. The exact number and configurati
- Page 391 and 392:
Lettering shall be as required. 2.
- Page 393:
H. All plumbing adhesives, joint co
- Page 396 and 397:
2.01 MATERIALS AND INSTALLATION - G
- Page 398 and 399:
F. GAS COCKS: 1. Cocks on 2" lines
- Page 400 and 401:
2.14 INSULATION A. Horizontal cold
- Page 402 and 403:
C. Temperature and pressure relief
- Page 404 and 405:
D. Yard hydrants shall meet ASSE 10
- Page 406 and 407:
sub-contract drawings. D. Coordinat
- Page 408 and 409:
F. Ductwork exposed to the weather
- Page 410 and 411:
G. Combination Fire/Smoke dampers,
- Page 412 and 413:
D. Units shall contain hermetic mul
- Page 414 and 415:
D. The Owner’s rooftop unit suppl
- Page 417 and 418:
PART 1 - GENERAL 1.01 DESCRIPTION S
- Page 419 and 420:
6. Final test report forms to be us
- Page 421:
the results in a clear format with
- Page 424 and 425:
contractual or agreed upon rates. A
- Page 426 and 427:
5. The electrical contractor is to
- Page 428 and 429:
fixtures and bear cost of redoing w
- Page 430 and 431:
1/4" scale plan view and elevations
- Page 432 and 433:
a. Provide all metering equipment a
- Page 434 and 435:
E. Fire Alarm: EMT or Plenum Cable
- Page 436 and 437:
B. Panels shall be three-phase, fou
- Page 438 and 439:
7. Where rigid conduit is laid belo
- Page 440 and 441:
usage, location, and size and numbe
- Page 442 and 443:
B. Provide engraved laminate plasti
- Page 444 and 445:
2. All syrup chases located on a fl
- Page 447 and 448:
SECTION 16050 16051 SITE BASIC ELEC
- Page 449 and 450:
1.08 RECORD DRAWINGS A. The Contrac
- Page 451 and 452:
1. For sleeve cross-section rectang
- Page 453:
e. Automatic transfer switches. END
- Page 456 and 457:
Contractor is required to perfume p
- Page 458 and 459:
C. Equipment Grounding Conductor Te
- Page 460 and 461:
B. Exothermic-Welded Connections: C
- Page 463 and 464:
SECTION 16075 SITE ELECTRICAL IDENT
- Page 465 and 466:
C. Aluminum Wraparound Marker Label
- Page 467 and 468:
2. Equipment Requiring Workspace Cl
- Page 469:
c. Phase C: Blue. 3. Colors for 480
- Page 472 and 473:
PART 2 - PRODUCTS 2.01 MANUFACTURER
- Page 474 and 475:
D. Terminate conductors No. 10 AWG
- Page 476 and 477:
1.04 SUBMITTALS A. Product Data: Fo
- Page 478 and 479:
12. Spiralduct, Inc./AFC Cable Syst
- Page 480 and 481:
6. Boxes and Enclosures: NEMA 250,
- Page 482 and 483:
1. Where conduits pass from warm to
- Page 484 and 485:
B. Shop Drawings: List of legends a
- Page 486 and 487:
C. Combination Switch and Receptacl
- Page 488 and 489:
1. Receptacles: Identify panelboard
- Page 490 and 491:
equired by the governing authoritie
- Page 493 and 494:
SECTION 16442 SITE PANELBOARDS PART
- Page 495 and 496:
E. Comply with NEMA PB 1. F. Comply
- Page 497 and 498:
2.03 PANELBOARD SHORT-CIRCUIT RATIN
- Page 499:
for coordinating the schedule of th
- Page 502 and 503:
fans and lights. The contractor is
- Page 505 and 506:
SECTION 16995 ELECTRICAL SYSTEMS CO
- Page 507:
APPENDIX A - GEOTECH REPORT NAPA CE
- Page 511 and 512:
Geotechnical Investigation South Ri
- Page 513 and 514:
Geotechnical Investigation South Ri
- Page 515 and 516:
Geotechnical Investigation South Ri
- Page 517 and 518:
Geotechnical Investigation South Ri
- Page 519 and 520:
Geotechnical Investigation South Ri
- Page 521 and 522:
Geotechnical Investigation South Ri
- Page 523 and 524:
Geotechnical Investigation South Ri
- Page 525 and 526:
Geotechnical Investigation South Ri
- Page 527 and 528:
Geotechnical Investigation South Ri
- Page 529 and 530:
Geotechnical Investigation South Ri
- Page 531 and 532:
Geotechnical Investigation South Ri
- Page 533 and 534:
Geotechnical Investigation South Ri
- Page 535 and 536:
APPENDIX A Vicinity Map Aerial Phot
- Page 537 and 538:
N Project Site Project Site KC ENGI
- Page 540 and 541:
LOG OF TEST BORING BORING NO.: 1 PR
- Page 542 and 543:
LOG OF TEST BORING BORING NO.: 2 PR
- Page 544 and 545:
LOG OF TEST BORING BORING NO.: 3 PR
- Page 546 and 547:
LOG OF TEST BORING BORING NO.: 4 PR
- Page 548 and 549:
LOG OF TEST BORING BORING NO.: 5 PR
- Page 550 and 551:
LOG OF TEST BORING BORING NO.: 6 PR
- Page 552 and 553:
LOG OF TEST BORING BORING NO.: 7 PR
- Page 554 and 555:
UNIFIED SOIL CLASSIFICATION SYSTEM
- Page 556 and 557:
Sample # Description Dry Density p.
- Page 558 and 559:
Particle Size Distribution Report 1
- Page 560 and 561:
Particle Size Distribution Report 1
- Page 562 and 563:
Particle Size Distribution Report 1
- Page 564 and 565:
Particle Size Distribution Report 1
- Page 566 and 567:
Particle Size Distribution Report 1
- Page 576 and 577:
APPENDIX B 2002 INVESTIGATION APPEN
- Page 580 and 581:
LOG OF TEST BORING BORING NO.: 1 PR
- Page 582 and 583:
LOG OF TEST BORING BORING NO.: 2 PR
- Page 584 and 585:
LOG OF TEST BORING BORING NO.: 3 PR
- Page 586 and 587:
LOG OF TEST BORING BORING NO.: 4 PR
- Page 588 and 589:
LOG OF TEST BORING BORING NO.: 5 PR
- Page 590 and 591:
LOG OF TEST BORING BORING NO.: 6 PR
- Page 592 and 593:
LOG OF TEST BORING BORING NO.: 7 PR
- Page 594 and 595:
LOG OF TEST BORING BORING NO.: 8 PR
- Page 596 and 597:
TEST PIT NO. DEPTH (feet) 4 0-8’
- Page 614:
APPENDIX C 2009 INVESTIGATION APPEN
- Page 635 and 636:
STORMWATER MANAGEMENT AND HYDRAULIC
- Page 637 and 638:
STORMWATER POND MODIFICATION SOUTH
- Page 639 and 640:
STORMWATER POND MODIFICATION SOUTH
- Page 641 and 642:
STORMWATER POND MODIFICATION SOUTH
- Page 643 and 644:
STORMWATER POND MODIFICATION SOUTH
- Page 645:
STORMWATER POND MODIFICATION SOUTH
- Page 649 and 650:
LEED 2009 New Construction Project
- Page 651 and 652:
LEED 2009 New Construction Project