10.03.2015 Views

specs

specs

specs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 3 - EXECUTION<br />

Section 05200<br />

Page 3<br />

3.01. ERECTION<br />

A. Replace joists damaged by bending or warping during handling and erection.<br />

B. Bridging shall comply with SJI Specifications and with details on Drawings.<br />

C. Minimum bearing and anchorage shall comply with SJI Specifications and Drawings as related to particular<br />

type of support.<br />

D. Provide erection bolts for joists located on column centerlines.<br />

E. Set joists to lines, levels, and spacing as indicated. Provide bearing plates as indicated or required to carry out<br />

structural requirements. Execute general handling and erection in accordance with SJI Specifications.<br />

F. Joists shall be permanently fastened to supports, and bridging and anchorage installed before any construction<br />

loads, other than workmen, are placed on joists.<br />

G. Welding shall be performed in accordance with AWS D1.1.<br />

H. Electrodes shall be properly stored and protected to prevent deterioration or damage by moisture and climate.<br />

I. After erection, field connections and abraded places of shop paint shall be touched up with same kind of paint<br />

as shop coat.<br />

J. Bottom chords of joists shall not be welded to supports until full dead load of roof is applied. Joists and<br />

supporting structure shall be braced for safety and stability until permanent bracing structures are in place.<br />

K. Bridging shall not be used to support conduit, piping, duct work, or other equipment.<br />

L. Hangers supporting loads in excess of 100 pounds shall not be attached directly to joist chords. See details on<br />

Structural Drawings for methods of supporting loads in excess of 100 pounds on joists.<br />

3.02. ADJUSTING<br />

A. Touch-up abrasions and welds with shop paint.<br />

B. Correct or replace damaged materials at no additional cost to the Owner.<br />

3.03. FIELD QUALITY CONTROL<br />

A. Laboratory Testing and Inspection<br />

1. Inspect condition of materials after erection.<br />

2. Inspect connections to supporting structure.<br />

END OF SECTION<br />

NAPA CENTURY CENTER XD 12<br />

#165582

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!