SECTION 02351<br />

Page 2<br />

3.02. FIELD QUALITY CONTROL<br />

A. Testing Laboratory Services:<br />

1. Identify bearing strata<br />

2. Inspect condition of bearing surface prior to placing concrete.<br />

3. Check sizes and quantity of reinforcing bars, tieing and securement.<br />

4. Monitor placement and consolidation of concrete.<br />

5. Maintain logs of footing installation to verify Contractor's log.<br />

3.03. CLEAN-UP<br />

A. Remove spoilage from footing excavations and legally dispose off site.<br />

END OF SECTION<br />