SECTION 02351<br />

CONCRETE FOOTINGS<br />

PART 1 - GENERAL<br />

1.01. SUMMARY<br />

A. Section Includes:<br />

1. Excavating and cleaning.<br />

2. Placing concrete and reinforcing steel.<br />

3. Furnish templates and place anchor bolts and dowels.<br />

B. Products Installed, not Furnished Under This Section:<br />

1. Reinforcing Steel<br />

2. Structural Concrete<br />

1.02. SUBMITTALS<br />

A. Submit shop drawings of reinforcement, dowels and anchor bolts.<br />

B. Submit a log of footings installed indicating the following:<br />

1. Identification mark.<br />

2. Footing size.<br />

3. Top of footing elevation.<br />

4. Top of bearing strata elevation (if applicable).<br />

5. Bottom of footing elevation.<br />

6. Concrete quantity.<br />

7. Concrete fill placed under footing.<br />

PART 2 - PRODUCTS - Not applicable (see related sections)<br />

PART 3 - EXECUTION<br />

3.01. INSTALLATION<br />

A. Excavating:<br />

1. Excavate for footings of required size and depth (minimum).<br />

2. Excavate to required minimum depth below finish grade or finish floor, or to required bearing strata.<br />

3. Clean bottom of excavations of loose dirt, debris and loose material.<br />

4. Where soft material is encountered, excavate to firm bearing.<br />

5. Fill over-excavations with concrete.<br />

B. Tolerances:<br />

1. Maximum lateral variation off of centerlines: 2 inches<br />

2. Footing size: not smaller than required sizes<br />

3. Top elevation: plus one inch, minus 2 inches<br />

4. Bottom (bearing) surface: level to within one vertical to ten horizontal.<br />

5. Placement of anchor bolts: within 1/4 inch any direction<br />

C. Drainage and Pumping:<br />

1. Maintain bearing surface of footing excavations dry.<br />

2. Remove accumulated water and ice and excavate to firm, dry surface.<br />

D. Reinforcing and Anchor Bolts:<br />

1. Tie reinforcing securely into cages or mats.<br />

2. Support reinforcing above ground with special chairs or precast bolsters.<br />

3. Secure reinforcing and anchor bolts in place, prevent shifting during placement of concrete.<br />

4. Use templates to position anchor bolts accurately.<br />

E. Concreting:<br />

1. Do not place concrete into or through standing water or mud.<br />

2. Do not place concrete on frozen subgrade.<br />

3. Place concrete within 8 hours of excavating.<br />

4. Place concrete in one continuous operation for each footing.<br />

5. Consolidate concrete by vibrating.<br />