END OF SECTION<br />

Section 01811<br />

Page 5<br />

pressured into overlooking deficient Work or loosening acceptance criteria to satisfy<br />

scheduling or cost issues.<br />

5. As tests progress and a deficiency is identified, the BECA discusses the issue with the<br />

executing Contractor.<br />

a) When there is no dispute on the deficiency and the subcontractor accepts responsibility to<br />

correct it:<br />

1. The BECA documents the deficiency and the subcontractor’s response and<br />

intentions and they go onto another test.<br />

2. The BECA will coordinate the rescheduled test with the affected Contractor, and<br />

the test is repeated.<br />

b) If there is a dispute about a deficiency, regarding whether it is a deficiency or who is<br />

responsible:<br />

1. The deficiency shall be documented on the non-compliance form with the<br />

subcontractor’s response and a copy given to the Contractor and to the<br />

subcontractor’s representative assumed to be responsible.<br />

2. Resolutions are made at the lowest management level possible. Other parties are<br />

brought into the discussions as needed. Interpretive authority is with the A/E.<br />

Final acceptance authority is with the PM.<br />

3. The BECA documents the resolution process.<br />

4. Once the interpretation and resolution have been decided, the appropriate party<br />

corrects the deficiency, signs the statement of correction on the non-compliance<br />

form, and provides it to the BECA. The BECA reschedules the test (and any<br />

additional population to be tested) with the affected Contractors, and the test(s) are<br />

repeated until satisfactory performance is achieved.<br />

5. Any required retesting that is a result of deficient installation shall not be<br />

considered a justified reason for a claim of delay or for a time extension by the<br />

Contractor.<br />