Section 01811<br />

Page 2<br />

E. Coordinate trades in accordance with the requirements in The General Conditions and General<br />

Requirements of the construction contract.<br />

F. Permit and provide access to locations of installed systems, subsystems, and components for<br />

testing and inspection.<br />

G. Review test procedures to ensure feasibility, safety and equipment protection and provide<br />

necessary written limits to be used during tests.<br />

H. Address current Designer and Owner punch list items before functional testing.<br />

I. Provide schedule and perform field quality control tests and inspections required by the Contract<br />

Documents and product manufacturers to BECA.<br />

1. Update schedule biweekly throughout the construction period.<br />

J. Provide field quality control testing and inspections on exterior enclosure construction (including<br />

filling out commissioning checklists) and submit reports to the BECA.<br />

K. Participate in testing/inspection procedures meetings.<br />

l. Correct deficiencies as interpreted by the BECA, Designer, and Owner.<br />

M. Reimburse Owner for non-compliant and/or failed tests and inspections as outlined in Divisions 01<br />

through 14.<br />

N. Address current BECA, Owner, and Designer punch list items.<br />

O. During construction, maintain as-built red line drawings for all drawings and final CAD as-builts.<br />

P. Coordinate with manufacturers to determine specific requirements to maintain the validity of the<br />

warranty.<br />

Q. Provide input for final commissioning documentation to the BECA.<br />

R. Submit operation and maintenance data for systems, subsystems, and components to the BECA.<br />

S. Participate in maintenance orientation, training, and inspection.<br />

1.5 DESIGNER RESPONSIBILITIES<br />

A. Provide paper and electronic copies of Project drawings and specifications to the BECA.<br />

B. Provide written responses to design review comments from the BECA or other parties as<br />

requested.<br />

C. Attend design, pre-construction, and construction phase coordination meetings.<br />

D. Participate in testing/inspection procedures meetings.<br />

E. Provide resolution for items for which the BECA and Contractor may be in disagreement.<br />

1.6 BUILDING ENVELOPE COMMISSIONING AUTHORITIES RESPONSIBILITIES<br />

The BECA shall begin Work in the Pre-Design or Design Phases and continue until all building enclosure<br />

systems have been accepted by both the Designer and the Owner. The specific tasks/responsibilities of the<br />

BECA include the following:<br />

A. Attend initial team meeting.<br />

B. Evaluate design concepts against OPR and Architect’s BOD.<br />

C. Incorporate commissioning requirements into the construction documents via a commissioning<br />

specification.<br />

D. Initial review of preliminary construction documents against OPR and BOD.<br />

E. Perform back check review of construction documents against OPR and BOD.<br />

F. Develop functional test plan for exterior enclosure.<br />

G. Develop quality control checklists.<br />

H. Review of Project drawings and specifications at 50%, and 100% completion for constructability,<br />

durability, and performance of exterior enclosure conformance.<br />

I. Review of pertinent building enclosure shop drawings/submittals for compliance with Contract<br />

Documents.<br />

J. Observe the construction and testing of mock-up(s).<br />

K. Document construction of commissioned components at the completion of mock-up testing.<br />

L. Design the exterior enclosure Commissioning Plan.<br />

M. Attend preconstruction conferences.<br />

N. Finalize Commissioning Plan.<br />

O. Attend pertinent progress meetings (as needed).<br />