10.03.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong><br />

2.07 CONCRETE MIX DESIGN<br />

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of<br />

laboratory trial mixture or field test data, or both, according to ACI 301.<br />

1. Use a qualified independent testing agency for preparing and reporting proposed mixture<br />

designs based on laboratory trial mixtures.<br />

2. Take care in developing mix designs to minimize curling and effects of casting directly on<br />

vapor retarder.<br />

3. Develop concrete mix designs for slabs on grade to minimize curling and other effects<br />

resulting from casting directly on vapor retarder sheet.<br />

B. Proportioning Normal Weight Concrete: Comply with ACI 211.1 recommendations.<br />

C. Admixtures: Add acceptable admixtures as recommended in ACI 211.1 and at rates<br />

recommended by manufacturer.<br />

D. Concrete Mix Properties:<br />

1. Structural Concrete:<br />

a. 28 day compressive strength: 3000 psi.<br />

b. Maximum aggregate size: 3/4 inch.<br />

c. Maximum slump: 3-5 inches.<br />

d. Maximum water/cement ratio: 0.5.<br />

2. Interior slab on grade:<br />

a. 28 day compressive strength: 4000 psi.<br />

b. Maximum aggregate size: 3/4 inch.<br />

c. Maximum slump: 3-5 inches.<br />

d. Maximum water/cement ratio: 0.5.<br />

3. Exterior concrete exposed to freeze-thaw cycles:<br />

a. 28 day compressive strength: 4000 psi.<br />

b. Maximum aggregate size: 3/4 inch.<br />

c. Maximum slump: 3-5 inches.<br />

d. Maximum water/cement ratio: 0.55.<br />

e. Entrained Air Content: 6±1%.<br />

4. Masonry Grout:<br />

a. 28 day compressive strength: 3000 psi.<br />

b. Maximum aggregate size: 3/8 inch.<br />

c. Maximum slump: 8-10 inches.<br />

2.08 MIXING<br />

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to<br />

ASTM C 94/C 94M, and furnish batch ticket information.<br />

B. Project Site Mixing: Measure, batch and mix in drum type batch mixer, according to ASTM C<br />

685. Mix each batch not less than 1-1/2 minutes and not more than 5 minutes.<br />

PART 3 EXECUTION<br />

3.01 EXAMINATION<br />

A. Verify lines, levels, and dimensions before proceeding with work of this section.<br />

3.02 PREPARATION<br />

A. Formwork: Comply with requirements of ACI 301. Design and fabricate forms to support all<br />

applied loads until concrete is cured, and for easy removal without damage to concrete.<br />

B. Verify that forms are clean and free of rust before applying release agent.<br />

C. Coordinate placement of embedded items with erection of concrete formwork and placement of<br />

form accessories.<br />

04-27-11 CAST-IN-PLACE CONCRETE<br />

03300 -4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!