<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong><br />

PART 2 PRODUCTS<br />

Not Used<br />

PART 3 EXECUTION<br />

3.01 PREPARATION<br />

A. Examine the areas and conditions under which work of this section will be performed. Correct<br />

conditions detrimental to timely and proper execution of the Work. Do not proceed until<br />

unsatisfactory conditions are corrected.<br />

B. In company with the Owner, Architect and appropriate engineering disciplines, visit the site and<br />

verify the extent of selective demolition required.<br />

1. Carefully identify limits of selective demolition.<br />

2. Mark interface surfaces as required to enable workers to identify items to be removed and<br />

items to be left intact.<br />

C. Provide, erect, and maintain temporary barriers at locations indicated and as otherwise<br />

determined to be necessary.<br />

D. Erect and maintain weatherproof closures for exterior openings.<br />

E. Erect and maintain temporary partitions to prevent spread of dust, odors, and noise to permit<br />

continued building occupancy.<br />

F. Protect existing materials that are not to be demolished.<br />

G. Prevent movement of structure; provide bracing and shoring.<br />

H. Notify affected utility companies before starting work and comply with their requirements.<br />

I. Mark location and termination of utilities.<br />

J. Provide appropriate temporary signage including signage for exit or building egress.<br />

3.02 DEMOLITION<br />

A. Disconnect, remove, and identify designated utilities within demolition areas.<br />

B. Demolish in an orderly and careful manner. Protect existing supporting structural members.<br />

C. Remove demolished materials from site except where specifically noted otherwise. Do not burn<br />

or bury materials on site.<br />

D. Remove materials as demolition progresses. Upon completion of demolition, leave areas in<br />

clean condition.<br />

E. Remove temporary facilities.<br />

END OF SECTION<br />

04-27-11 MINOR DEMOLITION FOR REMODELING<br />

02223 -2