1.4 MATERIALS AND EQUIPMENT<br />

A. Materials:<br />

1. All materials shall be new and of the type and quality specified herein.<br />

2. Specific materials and equipment specified is intended to establish a minimum<br />

standard of required quality. Where specified materials and equipment fail to<br />

meet minimum standards of existing federal, state and local codes and<br />

ordinances, the governing codes and ordinances shall prevail.<br />

3. The Contractor shall provide all minor miscellaneous materials necessary for the<br />

complete mechanical installation.<br />

4. For materials and equipment specified by description only, the Contractor shall<br />

provide materials or equipment suitable for the purpose intended. These shall be<br />

in conformance with all governing codes, these Specifications and normal trade<br />

practice.<br />

5. For materials or equipment specified by manufacturer’s name and catalog<br />

number, the Contractor shall provide the item specified. The Contractor may<br />

submit materials and equipment for prior approval to the Engineer.<br />

6. Supply materials and equipment to the site in original packages, containers or<br />

crates insofar as is practical. It shall be the Contractor’s responsibility to schedule<br />

deliveries in accordance with the overall Project schedule. The Contractor shall<br />

closely coordinate all deliveries with other Contractors and the Engineer.<br />

7. Provide for proper receipt, handling, storage, and protection from the elements<br />

for all materials and equipment to be used on this Project so as to effectively<br />

prevent damage or deterioration. Materials or equipment sustaining damage or<br />

undue deterioration from any cause whatsoever shall be replaced or repaired by<br />

Contractor as required by the Engineer.<br />

8. The Contractor shall properly protect all equipment from damage during<br />

construction. Thoroughly clean all fixtures, equipment and other supplied<br />

materials. Make all necessary repairs and apply touch up paint as required prior<br />

to final inspection and contract close out.<br />

9. All materials and equipment shall be listed by Underwriters’ Laboratories, Inc.<br />

(UL). Materials and Equipment shall meet the UL requirements of each standard<br />

in every case where such a standard has been established for that particular type<br />

of material. Equipment shall be UL listed as an entire assembly or system.<br />

B. Prior Approvals<br />

1. All requests for prior approvals must be received by the Engineer at least seven<br />

working days prior to bid date. Applications for prior approval shall be considered<br />

only from Contractors submitting bids on the Project. Contractors shall determine<br />

whether materials receiving prior approval are actually in accordance with details<br />

of the Specifications.<br />

2. The Contractor shall be responsible for all deficiencies that may exist from the<br />

use of substituted products or equipment, including all additional labor and<br />

materials required to complete the work. All dimensions and characteristics of<br />

substituted products shall be verified and coordinated with all affected trades and<br />

Subcontractors. Any required changes or modifications to the work of any other<br />

trade or Subcontractor incurred due to using accepted substituted products shall<br />

be coordinated and performed by this Contractor at no additional cost to the<br />

Owner.<br />

GENERAL CONDITIONS<br />

16010-3