SECTION 16010 - GENERAL CONDITIONS<br />

PART 1. - GENERAL<br />

1.1 SUMMARY<br />

A. General and Supplementary conditions within Division 0 and 1 are hereby incorporated<br />

and become part of these Specifications, covering all work in Division 16000, Electrical.<br />

B. Before submitting a proposal on the project, the Contractor shall visit the site and<br />

familiarize themselves with the conditions and limitations affecting Division 16000 work.<br />

No additional costs to the Owner shall be allowed for items verifiable during site visits.<br />

C. Contractor shall provide sufficient workers and materials to keep pace with the<br />

construction schedule. Contractor shall place orders for equipment such that job progress<br />

is not slowed due to late delivery and shall confirm delivery dates with suppliers.<br />

D. The Contractor shall provide office space and storage for materials and equipment<br />

supplied as required. Location shall be as directed by the General Contractor or the<br />

Architect/Engineer.<br />

E. Upon completion of the work shown and specified under Division 16000 and prior to final<br />

close out of the Project, the Contractor shall verify in writing that all systems are 100%<br />

complete and operating properly. This notification shall include copies of all<br />

Subcontractor notifications. Any system not operating properly at final inspection shall be<br />

immediately repaired and demonstrated to the Engineer.<br />

F. Rebates or credits provided by utility companies or equipment manufacturers shall be<br />

directly credited to the Owner.<br />

1.2 ELECTRICAL PLANS<br />

A. The Electrical Drawings and Specifications shall form a set of Plans for the electrical<br />

work. Neither the Drawings nor the Specifications shall be complete without the other.<br />

Any item shown on the Drawings or specified in the Specifications shall be considered as<br />

shown and specified on both.<br />

B. Any questions regarding the intent of the Drawings or Specifications shall be brought to<br />

the Engineer’s attention as soon as possible. If direction from the Engineer cannot be<br />

obtained due to time or communication limitations, the greater quantity, higher quality or<br />

condition most favorable to the Owner shall be assumed. Contractor shall provide all<br />

labor, materials, equipment, and miscellaneous items necessary for a complete and<br />

operational electrical installation, as shown on the Drawings and called for in these<br />

Specifications.<br />

C. Drawings:<br />

1. Contractor shall familiarize themselves with Architectural, Structural and<br />

Mechanical Drawings and Specifications. Coordinate all shafts, chases, furred<br />

spaces, suspended ceilings, locations of equipment, etc.<br />

2. Electrical Contractor shall coordinate routing of all conduit and wire within soffits<br />

provided by the General Contractor. The Electrical Contractor shall provide all<br />

soffiting required to cover installations not coordinated or specifically approved by<br />

the Architect and Engineer.<br />

GENERAL CONDITIONS<br />

16010-1