E. Cooling:<br />

required shall not be less than as specified in the following paragraphs, unless<br />

designated otherwise in specific sections.<br />

a. Storm and sanitary, waste and vent piping, inside the building shall be<br />

tested with air at 5 psi gauge pressure and shall hold this pressure for 15<br />

minutes without addition of more air. Provide final test with fixtures in<br />

place with 1” W.G. air pressure.<br />

b. Test Domestic water piping, tanks, valves and fittings with hydraulic<br />

pressure of 100 psig for a period of 24 hours.<br />

c. Test natural gas piping per NFPA Chapter 54, National Fuel Gas Code.<br />

1) For meter outlet pressure 14” W.C. or less, the piping shall be<br />

tested at a pressure of 10 psig maximum.<br />

2) For meter outlet pressure above 14” W.C. the piping shall be<br />

tested at a pressure of 50 percent greater than the maximum,<br />

but not less than 25 psi.<br />

d. Heating/cooling water piping and shall hold 150 psi gauge for 1 hour<br />

without leaks or additional water.<br />

1. System Guarantee: Contractor shall guarantee that the installation shall operate<br />

with complete noiseless circulation of cooling media through piping system and<br />

equipment.<br />

2. Defects: Contractor shall be responsible for defects which develop in the systems<br />

caused by faulty workmanship, material or equipment and shall replace any such<br />

faulty workmanship, material or equipment during a period of one year from date<br />

of final acceptance. Acceptance of the work shall not waive the guarantee.<br />

3. Tests: In the presence of the Architect/Engineer, or his duly representative, the<br />

cooling system shall be tested at 80 psi hydrostatic pressure and proved drop<br />

tight. Tests shall be complete before piping is connected to equipment or<br />

covered.<br />

F. Ventilation: Contractor shall guarantee complete uniform circulation of air through<br />

ventilated spaces without objectionable noise. Contractor shall assume responsibility for<br />

and shall replace any faulty workmanship, material or equipment during a period of 1<br />

year from date of final acceptance.<br />

END OF SECTION 15990<br />

06/25/09 TESTING AND BALANCING<br />

15990-2