SECTION 15990 - TESTING AND BALANCING<br />

PART 1. - GENERAL<br />

1.1 SUMMARY<br />

A. Test all piping systems as required by code and governing agencies. Certificates of<br />

Approval shall be furnished to Owner that all tests have been completed.<br />

B. All domestic water piping systems shall be disinfected in accordance to State and Local<br />

Codes. A 50 ppm water-chlorine solution must be allowed to stand in the potable water<br />

distribution system for at least 24 hours before flushing and returning to service.<br />

PART 2. - PRODUCTS<br />

Not Used<br />

PART 3. - EXECUTION<br />

3.1 GENERAL<br />

A. When the work has been completed, balance the air flow from each diffuser and register<br />

in accordance with the recommendations of the diffuser manufacturer, selling dampers,<br />

controls and/or other volume control devices in such a manner as to produce the air flow<br />

rate indicated on the drawings. Test to the satisfaction of the Engineer to insure for<br />

satisfactory operation of all equipment.<br />

B. Submit five (5) copies of certified Test and Balance Report to the Engineer for approval.<br />

Submittal shall include certified Test and Balance Reports and shop drawing(s)<br />

identifying all air terminal devices as listed in the Test and Balance Report and the<br />

equipment as it is identified on the Mechanical Plans.<br />

C. Test and start-up all equipment supplied under this contract. Provide all reports<br />

necessary to assure the Engineer and Owner that all functions of each piece of<br />

equipment have been thoroughly evaluated and deemed operable as designed.<br />

D. Plumbing:<br />

1. Defects: Contractor shall be responsible for defects which develop in the systems<br />

caused by faulty workmanship, material or equipment and shall replace any such<br />

faulty workmanship, material or equipment during a period of 1 year from date of<br />

final acceptance. Acceptance of the work shall not waive the guarantee.<br />

2. Approval: Inspect and test plumbing work for approval by Architect/ Engineer or a<br />

designated representative.<br />

3. Tests: Tests shall be made in the presence of the Architect/Engineer or a<br />

designated representative. Tests shall be made, at Contractor’s expense, and a<br />

certification furnished to the Architect/Engineer stating that satisfactory tests<br />

have been made.<br />

4. Piping: Tests of piping systems, except final test of complete systems, shall be<br />

made before piping is covered or connected to fixtures and equipment. Tests<br />

06/25/09 TESTING AND BALANCING<br />

15990-1