SECTION 00100 - BID SOLICITATION<br />

1.01 Bid Invitation and Submission for the above referenced project shall be by e-mail and<br />

through the Owner’s FTP Web Site.<br />

1.02 Bids are to be received no later than 3:00 PM Central Standard Time on the date defined by<br />

the Owner. LATE BIDS WILL NOT BE ACCEPTED FOR CONSIDERATION.<br />

1.03 Bidders agree in submitting a proposal that the bid will remain firm for a period not less than<br />

ninety (90) days from the bid due date stipulated above. Bids to receive consideration must<br />

be complete and cover the full scope of work described in the bid documents and must<br />

include unit pricing (see attached). Substitutions for material and equipment listed in the bid<br />

documents are not permitted. Clarifications and acknowledgement of Addenda shall be<br />

noted in the bid proposal.<br />

1.04 By submitting a bid each bidder represents and acknowledges the following:<br />

A. They have read and understand the bid documents and their bid is made in accordance<br />

therewith. Bid shall acknowledge and record the bid documents issuance dated and index of<br />

drawings;<br />

B. Basis of payment is a LUMP SUM;<br />

C. Has visited the site (General Contractor and/or Subcontractor) and has familiarized themselves<br />

with local conditions under which the work is to be performed. Discrepancies between existing<br />

conditions and bid documents shall be identified, written, and submitted to Owner for<br />

clarification prior to bid submission. Compensation for unidentified discrepancies shall be at the<br />

Owner's discretion for payment.<br />

D. Their bid is based upon the materials, systems and equipment described in the bid documents<br />

without exceptions (No substitutions will be accepted on material and equipment as listed in the<br />

bid documents).<br />

E. Their bid is based on a site specific schedule, from permit to Certificate of Occupancy, as stated<br />

in the Instructions to Bidders Document. No extension of the project's schedule is anticipated<br />

and no extension of the contract is allowed without the specific written instructions of the Owner.<br />

The proposed construction time is firm and critical.<br />

F. Within seven (7) days after award of the contract, the successful bidder will submit a<br />

construction schedule and subcontractor list to the Owner. Owner retains the right to reject any<br />

subcontractor bids as deemed necessary.<br />

G. Upon the start of construction, Contractor shall submit daily progress reports, and weekly<br />

progress photos (hard or digital photos), due on Thursday evenings.<br />

H. The Bid will identify the Project Manager and Superintendent for the job.<br />

1.05 Refer to Drawing Sheet G001 for Project Responsibility Matrix.<br />

1.06 All questions must be received in writing no less than seven days before bids are due.<br />

A. Bid proposals must be in accordance with the Owner provided Bid Template. See Budget Bid<br />

Template issued for site specific bids.<br />

END OF SECTION<br />

04-27-11 BID SOLICITATION<br />

00100 -1